University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for T*se   
Refine your search

Try Search all Collections


results 21-40 of 4131 item(s)  page 2 of 207 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Pacific Northwest Economic Base Study for Power Markets - Fisheries
21. Pacific Northwest Economic Base Study for Power Markets - Fisheries
Columbia-North Pacific Region Comprehensive Framework Study of Water and Related Lands. Appendix XV:
22. Columbia-North Pacific Region Comprehensive Framework Study of Water and Related Lands. Appendix XV: Electric Power.
Pacific Northwest Economic Base Study for Power Markets - Agriculture and Food Processing
23. Pacific Northwest Economic Base Study for Power Markets - Agriculture and Food Processing
The Dalles-Celilo portage; its history and influence
24. The Dalles-Celilo portage; its history and influence

Columbia-North Pacific Region Comprehensive Framework Study of Water and Related Lands. Appendix XVI:
25. Columbia-North Pacific Region Comprehensive Framework Study of Water and Related Lands. Appendix XVI: Comprehensive Framework Plans.
Installation of steel Y-shaped tunnels underneath standpipes, October 15, 1924
26. Installation of steel Y-shaped tunnels underneath standpipes, October 15, 1924
Rear view of powerhouse showing newly constructed air tanks for the fourth generating unit, February
27. Rear view of powerhouse showing newly constructed air tanks for the fourth generating unit, February 26, 1925
Interior of powerhouse with fourth generating unit installed, February 26, 1925
28. Interior of powerhouse with fourth generating unit installed, February 26, 1925

Construction on the addition to the south end of the powerhouse, April 24, 1924
29. Construction on the addition to the south end of the powerhouse, April 24, 1924
Two men standing in pipe attached to large valves at Masonry Dam, November 25, 1914
30. Two men standing in pipe attached to large valves at Masonry Dam, November 25, 1914
Fourth penstock installed between standpipe and powerhouse, October 15, 1924
31. Fourth penstock installed between standpipe and powerhouse, October 15, 1924
Nearly completed south addition to powerhouse, August 26, 24
32. Nearly completed south addition to powerhouse, August 26, 24

Diablo Powerhouse interior looking north from the south end of the cooling water pipe gallery, water
33. Diablo Powerhouse interior looking north from the south end of the cooling water pipe gallery, water cleaner in foreground, July 1989
Gorge Inn, formerly the mess hall for the Skagit Hydroelectric Project employees, Newhalem, July 1989
34. Gorge Inn, formerly the mess hall for the Skagit Hydroelectric Project employees, Newhalem, July 1989
Interior of headhouse for the Diablo Dam incline railway, showing cable and drums for lily hoist, July
35. Interior of headhouse for the Diablo Dam incline railway, showing cable and drums for lily hoist, July 1989
Spillgates of Gorge High Dam as seen from the intake, July 1989
36. Spillgates of Gorge High Dam as seen from the intake, July 1989

Gorge High Dam, showing unusually high water in Gorge Lake, July 1989
37. Gorge High Dam, showing unusually high water in Gorge Lake, July 1989
View from roof of the Gorge Powerhouse, looking west to the switchyard with the Pratt truss vehicle bridge
38. View from roof of the Gorge Powerhouse, looking west to the switchyard with the Pratt truss vehicle bridge to the right, July 1989
Turbine pit area of Gorge Powerhouse, showing relief valve for generating unit 23 in foreground and governor
39. Turbine pit area of Gorge Powerhouse, showing relief valve for generating unit 23 in foreground and governor oil tanks and pumps in the left rear, July 1989
Detail view of Pelton butterfly and needle valves at elevation 1044 of Diablo Dam, July 1989
40. Detail view of Pelton butterfly and needle valves at elevation 1044 of Diablo Dam, July 1989
select all : clear all : add to favorites
results 21-40 of 4131 item(s)  page 2 of 207 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^