University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Town--and   
Refine your search

Try Search all Collections


results 181-200 of 124374 item(s)  page 10 of 6219 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Workers laying stringers on trestle, August 4, 1903
181. Workers laying stringers on trestle, August 4, 1903
Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July
182. Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July 1989
Spillway no. 1 at the flume, December 31, 1903
183. Spillway no. 1 at the flume, December 31, 1903
Men working on pile drivers, May 30, 1903
184. Men working on pile drivers, May 30, 1903

Powerhouse interior showing placement of water wheel for generating unit no. 3 using 50-ton crane, June
185. Powerhouse interior showing placement of water wheel for generating unit no. 3 using 50-ton crane, June 8, 1904
Turbine before installation in the powerhouse, Cedar River, ca. 1900
186. Turbine before installation in the powerhouse, Cedar River, ca. 1900
Group photograph of men associated with the Cedar River pipeline construction project, March 8, 1900
187. Group photograph of men associated with the Cedar River pipeline construction project, March 8, 1900
Man applying molten lead to main water pipeline joints near Queen Anne standpipe, September 8, 1899
188. Man applying molten lead to main water pipeline joints near Queen Anne standpipe, September 8, 1899

Installation of wooden stave pipe with iron hoops in trench, January 26, 1900
189. Installation of wooden stave pipe with iron hoops in trench, January 26, 1900
Dam, headworks and intake area under construction, November 14, 1899
190. Dam, headworks and intake area under construction, November 14, 1899
Panorama of Masonry Dam under construction, March 17, 1914
191. Panorama of Masonry Dam under construction, March 17, 1914
Pipeline trench through Dunlap Canyon near Renton, ca. 1899
192. Pipeline trench through Dunlap Canyon near Renton, ca. 1899

Cedar River as viewed from Clifford's Bridge near Landsburg headworks site, ca. 1899
193. Cedar River as viewed from Clifford's Bridge near Landsburg headworks site, ca. 1899
Workers laying steel pipe near the Black River, west of Renton, ca. 1899
194. Workers laying steel pipe near the Black River, west of Renton, ca. 1899
Workers with shovels preparing the slopes of the high service reservoir in City Park for concrete pouring,
195. Workers with shovels preparing the slopes of the high service reservoir in City Park for concrete pouring, January 19, 1900
Construction of powerhouse, May 30, 1911
196. Construction of powerhouse, May 30, 1911

Steel pipe being installed in trench in the riverbed of the Black River, ca. 1899
197. Steel pipe being installed in trench in the riverbed of the Black River, ca. 1899
Building the dam at Black River, part of the process of diverting the Cedar River into Lake Washington,
198. Building the dam at Black River, part of the process of diverting the Cedar River into Lake Washington, ca. 1899
Workers laying steel pipe near Renton, ca. 1899
199. Workers laying steel pipe near Renton, ca. 1899
Steel pipe laid in Dunlap Canyon, south of Seattle, November 9, 1899
200. Steel pipe laid in Dunlap Canyon, south of Seattle, November 9, 1899
select all : clear all : add to favorites
results 181-200 of 124374 item(s)  page 10 of 6219 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^