University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Wharves--Alaska--Ikatan   
Refine your search

Try Search all Collections


results 101-120 of 76026 item(s)  page 6 of 3802 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Tramway used for transporting mortar into the high service reservoir during construction, City Park,
101. Tramway used for transporting mortar into the high service reservoir during construction, City Park, January 19, 1900
Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
102. Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
Bridge over the Cedar River near Renton, ca. 1899
103. Bridge over the Cedar River near Renton, ca. 1899
Men inside and on top of wooden stave pipe during installation, January 26, 1900
104. Men inside and on top of wooden stave pipe during installation, January 26, 1900

Trench where steel pipe wil be joined with wood stave pipe, vicinity of Renton, ca. 1899
105. Trench where steel pipe wil be joined with wood stave pipe, vicinity of Renton, ca. 1899
Laying pipe in trench in the riverbed of the Black River, ca. 1899
106. Laying pipe in trench in the riverbed of the Black River, ca. 1899
Steel pipe being installed in a trench, looking west toward Renton and the Black River, ca. September
107. Steel pipe being installed in a trench, looking west toward Renton and the Black River, ca. September 1899
Panorama of Masonry Dam under construction, March 17, 1914
108. Panorama of Masonry Dam under construction, March 17, 1914

Cofferdam construction at the Lake Tapps outlet, April 4, 1911
109. Cofferdam construction at the Lake Tapps outlet, April 4, 1911
Workers excavating the Landsburg headworks foundation, September 6, 1899
110. Workers excavating the Landsburg headworks foundation, September 6, 1899
Man with wrench viewing pressure gauge during test at end of steel pipe, January 12, 1900
111. Man with wrench viewing pressure gauge during test at end of steel pipe, January 12, 1900
Men reading the pressure gauge on a steel pipe, January 26, 1900
112. Men reading the pressure gauge on a steel pipe, January 26, 1900

Powerhouse interior showing generating unit no. 1 in operation and unit no. 2 being built, April 19,
113. Powerhouse interior showing generating unit no. 1 in operation and unit no. 2 being built, April 19, 1904
Filling in a trench after completing a pressure test of a pipe, probably in Seattle or Renton, January
114. Filling in a trench after completing a pressure test of a pipe, probably in Seattle or Renton, January 12, 1900
Steel pipe after completing a pressure test, probably in Seattle or Renton, January 12, 1900
115. Steel pipe after completing a pressure test, probably in Seattle or Renton, January 12, 1900
Laying pipe in a curved trench at South Washington St. and 12th Ave. S., Seattle, March 2, 1900
116. Laying pipe in a curved trench at South Washington St. and 12th Ave. S., Seattle, March 2, 1900

Intake and diversion dam with partially completed radial gate, April 18, 1904
117. Intake and diversion dam with partially completed radial gate, April 18, 1904
Gravel pit at Lakeview Cemetery north of the high reservoir on Capitol Hill, Seattle, September 8th,
118. Gravel pit at Lakeview Cemetery north of the high reservoir on Capitol Hill, Seattle, September 8th, 1899
Completed pipeline going under the Black River, ca. 1899
119. Completed pipeline going under the Black River, ca. 1899
Flume under construction, inside view, May 6, 1911
120. Flume under construction, inside view, May 6, 1911
select all : clear all : add to favorites
results 101-120 of 76026 item(s)  page 6 of 3802 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^