University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Organization--Ministerial   
Refine your search

Try Search all Collections


results 141-160 of 75669 item(s)  page 8 of 3784 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Steel pipe laid in trench at Dunlap Canyon, south of Seattle, November 9, 1899
141. Steel pipe laid in trench at Dunlap Canyon, south of Seattle, November 9, 1899
Flume under construction, top view, May 6, 1911
142. Flume under construction, top view, May 6, 1911
Excavation for steel pipe in Dunlap Canyon near Renton, September 22, 1899
143. Excavation for steel pipe in Dunlap Canyon near Renton, September 22, 1899
Building dam across Black River as part of the process of shifiting the path of the Cedar River, ca.
144. Building dam across Black River as part of the process of shifiting the path of the Cedar River, ca. 1899

Trench for laying pipeline near Renton, ca. 1899
145. Trench for laying pipeline near Renton, ca. 1899
Incline railroad used for moving gravel, east of the dam site, October 7, 1924
146. Incline railroad used for moving gravel, east of the dam site, October 7, 1924
Workers at site of gravel washer above dam site on the east, July 24, 1924
147. Workers at site of gravel washer above dam site on the east, July 24, 1924
Southern face of dam, showing excavation for east abutment on the right side, September 12, 1925
148. Southern face of dam, showing excavation for east abutment on the right side, September 12, 1925

Dam site showing chutes for carrying concrete, October 1, 1924
149. Dam site showing chutes for carrying concrete, October 1, 1924
Workers on a cable incline, viewed from below, April 21, 1903
150. Workers on a cable incline, viewed from below, April 21, 1903
Dam construction after Baker River was blocked off by upper cofferdam, August 28, 1924
151. Dam construction after Baker River was blocked off by upper cofferdam, August 28, 1924
Man standing in completed penstock tunnel between dam and powerhouse, October 22, 1925
152. Man standing in completed penstock tunnel between dam and powerhouse, October 22, 1925

Draft tube that will go under one of the powerhouse water wheels, pictured after delivery in town next
153. Draft tube that will go under one of the powerhouse water wheels, pictured after delivery in town next to the warehouse, February 7, 1925
Form for water wheel draft tube, after delivery to Concrete, March 20, 1925
154. Form for water wheel draft tube, after delivery to Concrete, March 20, 1925
Generating units 1 and 2 installed in the powerhouse, August 26, 1925
155. Generating units 1 and 2 installed in the powerhouse, August 26, 1925
Crane operating at dam site, July 24, 1924
156. Crane operating at dam site, July 24, 1924

Building homes at the workers' camp above the power plant site, July 24, 1924
157. Building homes at the workers' camp above the power plant site, July 24, 1924
Bridge at entrance to diversion tunnel, just south of dam site, June 30, 1924
158. Bridge at entrance to diversion tunnel, just south of dam site, June 30, 1924
Construction of southern face of dam, August 3, 1925
159. Construction of southern face of dam, August 3, 1925
Panorama of Masonry Dam under construction, August 7, 1914
160. Panorama of Masonry Dam under construction, August 7, 1914
select all : clear all : add to favorites
results 141-160 of 75669 item(s)  page 8 of 3784 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^