University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Cradleboards--British   
Refine your search

Try Search all Collections


results 181-200 of 75507 item(s)  page 10 of 3776 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Mist and spray rising from water coming over spillways at Diablo Dam, February 3, 1931
181. Mist and spray rising from water coming over spillways at Diablo Dam, February 3, 1931
Flume line site, April 23, 1903
182. Flume line site, April 23, 1903
Construction on cable incline near county road, April 21, 1903
183. Construction on cable incline near county road, April 21, 1903
Walkway under construction on top of completed Diablo Dam, September 16, 1930
184. Walkway under construction on top of completed Diablo Dam, September 16, 1930

Diversion dam and tunnel under construction, Diablo Dam, April 12, 1928
185. Diversion dam and tunnel under construction, Diablo Dam, April 12, 1928
Puyallup River at site of future Electron Diversion Dam, showing construction camp no. 1, March 14, 1903
186. Puyallup River at site of future Electron Diversion Dam, showing construction camp no. 1, March 14, 1903
Seattle City Light substation at Diablo Dam, March 28, 1928
187. Seattle City Light substation at Diablo Dam, March 28, 1928
Pouring concrete for Diablo Dam construction, with man hanging from crane lines, using guidewire to direct
188. Pouring concrete for Diablo Dam construction, with man hanging from crane lines, using guidewire to direct concrete funnel, October 3, 1928

Diversion dam under construction, Diablo Dam, April 25, 1928
189. Diversion dam under construction, Diablo Dam, April 25, 1928
Workers at spur railway site, April 25, 1903
190. Workers at spur railway site, April 25, 1903
Diablo Dam under construction, ca. 1928
191. Diablo Dam under construction, ca. 1928
U.S. Ranger Station at Reflector Bar, March 29, 1927
192. U.S. Ranger Station at Reflector Bar, March 29, 1927

Installation of fourth water wheel turbine and generator in powerhouse, October 15, 1924
193. Installation of fourth water wheel turbine and generator in powerhouse, October 15, 1924
Diablo Canyon as seen from the water, with footbridge overhead, May 27, 1927
194. Diablo Canyon as seen from the water, with footbridge overhead, May 27, 1927
Dam construction at headworks, November 1, 1910
195. Dam construction at headworks, November 1, 1910
Interior view of the penstock for unit no. 2, with ghostly figure of welder at work, November 2, 1923
196. Interior view of the penstock for unit no. 2, with ghostly figure of welder at work, November 2, 1923

Workers beside Larner-Johnson flow control valve, draft tube and a portion of scroll case, unit no. 2,
197. Workers beside Larner-Johnson flow control valve, draft tube and a portion of scroll case, unit no. 2, Gorge Dam Powerhouse, September 26, 1923
Scroll case and Larner-Johnson flow control valve in unit no. 1 under construction, Gorge Dam Powerhouse,
198. Scroll case and Larner-Johnson flow control valve in unit no. 1 under construction, Gorge Dam Powerhouse, August 13, 1923
Gorge Dam Powerhouse, West Portal of tunnel, and bridge, as seen from across the Skagit River, looking
199. Gorge Dam Powerhouse, West Portal of tunnel, and bridge, as seen from across the Skagit River, looking southeast, May 23, 1923
Man standing among reinforcing steel for draft tube on unit no. 1, Gorge Dam Powerhouse, February 23,
200. Man standing among reinforcing steel for draft tube on unit no. 1, Gorge Dam Powerhouse, February 23, 1923
select all : clear all : add to favorites
results 181-200 of 75507 item(s)  page 10 of 3776 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^