University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for (Firm);   
Refine your search

Try Search all Collections


results 201-220 of 16200 item(s)  page 11 of 810 : ( <<  11  12  13  14  15  16  17  18  19  20  >> ) :: previous : next
select all : clear all : add to favorites
Turbine pit, Diablo Powerhouse, July 1989
201. Turbine pit, Diablo Powerhouse, July 1989
Control room, Diablo Powerhouse, July 1989
202. Control room, Diablo Powerhouse, July 1989
Diablo Canyon looking downstream from valve house of dam, July 1989
203. Diablo Canyon looking downstream from valve house of dam, July 1989
Men working on pile drivers, May 30, 1903
204. Men working on pile drivers, May 30, 1903

Transmission line poles east of Sumner, August 10, 1903
205. Transmission line poles east of Sumner, August 10, 1903
Setting the turbine runner in place, Diablo Powerhouse interior, May 5, 1936
206. Setting the turbine runner in place, Diablo Powerhouse interior, May 5, 1936
Conduit in floor slab of Diablo Powerhouse, April 1936
207. Conduit in floor slab of Diablo Powerhouse, April 1936
Turbine shaft and runner, Diablo Powerhouse, Skagit River, April 28, 1936
208. Turbine shaft and runner, Diablo Powerhouse, Skagit River, April 28, 1936

Powerhouse interior showing placement of water wheel for generating unit no. 3 using 50-ton crane, June
209. Powerhouse interior showing placement of water wheel for generating unit no. 3 using 50-ton crane, June 8, 1904
Construction camp no. 3, March 16, 1903
210. Construction camp no. 3, March 16, 1903
Diablo Powerhouse and camp, Reflector Bar, Skagit River, October 1, 1935
211. Diablo Powerhouse and camp, Reflector Bar, Skagit River, October 1, 1935
Gorge Powerhouse showing Mount Ross to the north, ca. 1930
212. Gorge Powerhouse showing Mount Ross to the north, ca. 1930

Rear view of powerhouse showing pressure tanks, standpipes and flume, February 19, 1912
213. Rear view of powerhouse showing pressure tanks, standpipes and flume, February 19, 1912
Turbine before installation in the powerhouse, Cedar River, ca. 1900
214. Turbine before installation in the powerhouse, Cedar River, ca. 1900
Laying main pipe on E. Harrison St., Seattle, September 8, 1899
215. Laying main pipe on E. Harrison St., Seattle, September 8, 1899
Men constructing a section of a wooden stave pipe in a trench, March 9, 1900
216. Men constructing a section of a wooden stave pipe in a trench, March 9, 1900

Long section of completed pipeline, March 9, 1900
217. Long section of completed pipeline, March 9, 1900
Pipeline in Dunlap Canyon being tested, March 9, 1900
218. Pipeline in Dunlap Canyon being tested, March 9, 1900
Completed pipeline in Dunlap Canyon being tested, March 9, 1900
219. Completed pipeline in Dunlap Canyon being tested, March 9, 1900
Man standing at new point of intake, June 7, 1903
220. Man standing at new point of intake, June 7, 1903
select all : clear all : add to favorites
results 201-220 of 16200 item(s)  page 11 of 810 : ( <<  11  12  13  14  15  16  17  18  19  20  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^