University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Plants--Washington   
Refine your search

Try Search all Collections


results 1-20 of 132461 item(s)  page 1 of 6624 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Main turbine room of powerhouse during construction, September 16, 1925
1. Main turbine room of powerhouse during construction, September 16, 1925
First generator installed at the powerhouse, July 20, 1911
2. First generator installed at the powerhouse, July 20, 1911
Reinforcing mat and rock formation that will be below the no. 1 generating unit in the powerhouse, May
3. Reinforcing mat and rock formation that will be below the no. 1 generating unit in the powerhouse, May 8, 1925
Snoqulamie Power Plant workers' quarters, office and shop building, and transformer house, Snoqualmie
4. Snoqulamie Power Plant workers' quarters, office and shop building, and transformer house, Snoqualmie River abover the falls, 1910

Hydroelectric plant intake, office, transformer house, and workers' cottages, on the Snoqualmie River
5. Hydroelectric plant intake, office, transformer house, and workers' cottages, on the Snoqualmie River above the falls, 1912
Night view of the Grand Coulee Dam, Third Powerplant, taken from the left abutment of the dam and showing
6. Night view of the Grand Coulee Dam, Third Powerplant, taken from the left abutment of the dam and showing construction progress for the powerplant, Washington, May 18, 1973
Whispering
7. Whispering
Man posed next to turbine water wheel in powerhouse, with pressure regulators to the right, n.d.
8. Man posed next to turbine water wheel in powerhouse, with pressure regulators to the right, n.d.

Diablo Powerhouse under construction showing incline railway and construction camp, Reflector Bar, Skagit
9. Diablo Powerhouse under construction showing incline railway and construction camp, Reflector Bar, Skagit River, ca. 1934
Interior of powerhouse showing second generating unit, April 17, 1904
10. Interior of powerhouse showing second generating unit, April 17, 1904
Men in the main pressure tunnel installing the sluice pipe, September 8, 1925
11. Men in the main pressure tunnel installing the sluice pipe, September 8, 1925
Powerhouse and penstock under construction, January 2, 1904
12. Powerhouse and penstock under construction, January 2, 1904

Man in diving suit, Gorge Dam Powerhouse, ca. 1919-1924
13. Man in diving suit, Gorge Dam Powerhouse, ca. 1919-1924
Free-standing fireplace, n.d.
14. Free-standing fireplace, n.d.
Rear view of Electron Plant showing high-tension wires, September 4, 1904
15. Rear view of Electron Plant showing high-tension wires, September 4, 1904
Dam site showing chutes for carrying concrete, October 1, 1924
16. Dam site showing chutes for carrying concrete, October 1, 1924

Forms for the creation of the main tunnel, in the center of the tunnel system, May 7, 1925
17. Forms for the creation of the main tunnel, in the center of the tunnel system, May 7, 1925
Completed section of flume, November 16, 1903
18. Completed section of flume, November 16, 1903
Completed intake and transformer house, ca. 1900
19. Completed intake and transformer house, ca. 1900
Drug Plant Garden (now Medicinal Herb Garden), University of Washington, n.d.
20. Drug Plant Garden (now Medicinal Herb Garden), University of Washington, n.d.
select all : clear all : add to favorites
results 1-20 of 132461 item(s)  page 1 of 6624 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^