University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Coll   
Refine your search

Try Search all Collections


results 281-300 of 46098 item(s)  page 15 of 2305 : ( <<  11  12  13  14  15  16  17  18  19  20  >> ) :: previous : next
select all : clear all : add to favorites
Embankment construction using scrapers and steamrollers, northern Lake Tapps, July 26, 1910
281. Embankment construction using scrapers and steamrollers, northern Lake Tapps, July 26, 1910
Two of the four standpipes located at top of the hill next to the powerhouse, October 17, 1911
282. Two of the four standpipes located at top of the hill next to the powerhouse, October 17, 1911
Air pipe installation for penstocks next to powerhouse, September 7, 1911
283. Air pipe installation for penstocks next to powerhouse, September 7, 1911
Fourth penstock installed between standpipe and powerhouse, October 15, 1924
284. Fourth penstock installed between standpipe and powerhouse, October 15, 1924

Gate construction at intake near diversion dam, August 31, 1911
285. Gate construction at intake near diversion dam, August 31, 1911
Wood frame construction of the powerhouse, August 11, 1911
286. Wood frame construction of the powerhouse, August 11, 1911
Culvert construction underneath the Northern Pacific Railway showing a steam-powered pile driver on the
287. Culvert construction underneath the Northern Pacific Railway showing a steam-powered pile driver on the tracks, Dieringer, June 15, 1911
Construction camp no. 5, April 22, 1903
288. Construction camp no. 5, April 22, 1903

Flume construction under the Northern Pacific Railway tracks at Buckley, March 22, 1911
289. Flume construction under the Northern Pacific Railway tracks at Buckley, March 22, 1911
Steam shovel excavating powerhouse site near Dieringer, January 16, 1911
290. Steam shovel excavating powerhouse site near Dieringer, January 16, 1911
Allis-Chalmers water wheel no. 2 installed in powerhouse, October 17, 1911
291. Allis-Chalmers water wheel no. 2 installed in powerhouse, October 17, 1911
Scrapers grading the site for the dam at Dingle Basin, May 31, 1910
292. Scrapers grading the site for the dam at Dingle Basin, May 31, 1910

Horse drawn scrapers excavating in Dingle Basin near the canal, July 1, 1910
293. Horse drawn scrapers excavating in Dingle Basin near the canal, July 1, 1910
Panoramic view of Camp 2 and construction support buildings at Masonry Dam, October 26, 1913
294. Panoramic view of Camp 2 and construction support buildings at Masonry Dam, October 26, 1913
Steam shovel digging canal to Lake Tapps, June 16, 1910
295. Steam shovel digging canal to Lake Tapps, June 16, 1910
Steam shovel excavating the tailrace next to powerhouse, August 31, 1911
296. Steam shovel excavating the tailrace next to powerhouse, August 31, 1911

Partially completed powerhouse interior, August 31, 1911
297. Partially completed powerhouse interior, August 31, 1911
Building the embankment to enclose Dingle Basin, July 1, 1910
298. Building the embankment to enclose Dingle Basin, July 1, 1910
Railroad locomotive with load of wood and lumber at top of incline near powerhouse, May 31, 1910
299. Railroad locomotive with load of wood and lumber at top of incline near powerhouse, May 31, 1910
Construction camp no. 8, May 30, 1903
300. Construction camp no. 8, May 30, 1903
select all : clear all : add to favorites
results 281-300 of 46098 item(s)  page 15 of 2305 : ( <<  11  12  13  14  15  16  17  18  19  20  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^