University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Egypt--Dayr   
Refine your search

Try Search all Collections


results 141-160 of 121290 item(s)  page 8 of 6065 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
View from roof of the Gorge Powerhouse, looking west to the switchyard with the Pratt truss vehicle bridge
141. View from roof of the Gorge Powerhouse, looking west to the switchyard with the Pratt truss vehicle bridge to the right, July 1989
Diablo Commissary, built in 1952 to serve the residents of Diablo, July 1989
142. Diablo Commissary, built in 1952 to serve the residents of Diablo, July 1989
Harnischfeger bridge crane being placed in position during construction of the Diablo Powerhouse, May
143. Harnischfeger bridge crane being placed in position during construction of the Diablo Powerhouse, May 1935
Diablo Powerhouse interior showing the upper oil room with Sharples oil centrifuge, July 1989
144. Diablo Powerhouse interior showing the upper oil room with Sharples oil centrifuge, July 1989

Pansey House, a bunkhouse in Newhalem still used by Seattle City Light to house temporary consultants,
145. Pansey House, a bunkhouse in Newhalem still used by Seattle City Light to house temporary consultants, July 1989
Butterfly valve as seen from inside the scroll case in Ross Powerhouse, July 1987
146. Butterfly valve as seen from inside the scroll case in Ross Powerhouse, July 1987
Canal excavation at dam headworks, August 4, 1910
147. Canal excavation at dam headworks, August 4, 1910
Diablo Incline Railway, with waiting room in foreground, July 1989
148. Diablo Incline Railway, with waiting room in foreground, July 1989

North and west facades of the Diablo Powerhouse, July 1989
149. North and west facades of the Diablo Powerhouse, July 1989
Visitors' lobby of the Diablo Powerhouse, July 1989
150. Visitors' lobby of the Diablo Powerhouse, July 1989
Transmission line poles east of Sumner, August 10, 1903
151. Transmission line poles east of Sumner, August 10, 1903
Setting the turbine runner in place, Diablo Powerhouse interior, May 5, 1936
152. Setting the turbine runner in place, Diablo Powerhouse interior, May 5, 1936

Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
153. Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
Rear view of powerhouse showing pressure tanks, standpipes and flume, February 19, 1912
154. Rear view of powerhouse showing pressure tanks, standpipes and flume, February 19, 1912
Men constructing a section of a wooden stave pipe in a trench, March 9, 1900
155. Men constructing a section of a wooden stave pipe in a trench, March 9, 1900
Inside view of a section of wooden stave pipe during testing, March 8, 1900
156. Inside view of a section of wooden stave pipe during testing, March 8, 1900

Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
157. Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
Men inside and on top of wooden stave pipe during installation, January 26, 1900
158. Men inside and on top of wooden stave pipe during installation, January 26, 1900
Laying pipe in trench in the riverbed of the Black River, ca. 1899
159. Laying pipe in trench in the riverbed of the Black River, ca. 1899
Cofferdam construction at the Lake Tapps outlet, April 4, 1911
160. Cofferdam construction at the Lake Tapps outlet, April 4, 1911
select all : clear all : add to favorites
results 141-160 of 121290 item(s)  page 8 of 6065 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^