University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Lower   
Refine your search

Try Search all Collections


results 101-120 of 1250 item(s)  page 6 of 63 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Man in surge chamber before penstock tunnel was opened for operation, October 22, 1925
101. Man in surge chamber before penstock tunnel was opened for operation, October 22, 1925
Reinforcing mat and rock formation that will be below the no. 1 generating unit in the powerhouse, May
102. Reinforcing mat and rock formation that will be below the no. 1 generating unit in the powerhouse, May 8, 1925
Men placing penstocks into position in the penstock tunnel, June 21, 1925
103. Men placing penstocks into position in the penstock tunnel, June 21, 1925
Men at north end of penstocks that connect to the powerhouse, June 13, 1925
104. Men at north end of penstocks that connect to the powerhouse, June 13, 1925

Man standing in concrete-lined tunnel between dam and the four penstocks going to the powerhouse, October
105. Man standing in concrete-lined tunnel between dam and the four penstocks going to the powerhouse, October 22, 1925
Men in the main pressure tunnel installing the sluice pipe, September 8, 1925
106. Men in the main pressure tunnel installing the sluice pipe, September 8, 1925
Powerhouse foundation, showing draft tubes for generating units, May 12, 1925
107. Powerhouse foundation, showing draft tubes for generating units, May 12, 1925
Icy area south of dam site, December 21, 1924
108. Icy area south of dam site, December 21, 1924

Powerhouse after dam completion, October 20, 1925
109. Powerhouse after dam completion, October 20, 1925
Powerhouse, nearly complete, September 16, 1925
110. Powerhouse, nearly complete, September 16, 1925
South side of powerhouse, nearly complete, September 21, 1925
111. South side of powerhouse, nearly complete, September 21, 1925
Layers of reinforcing bars at the tunnel intake, September 8, 1925
112. Layers of reinforcing bars at the tunnel intake, September 8, 1925

Main turbine room of powerhouse during construction, September 16, 1925
113. Main turbine room of powerhouse during construction, September 16, 1925
Locomotive at power house excavation site, December 21, 1924
114. Locomotive at power house excavation site, December 21, 1924
Dam site and diversion tunnel entrance as viewed from bridge north of site, October 7, 1924
115. Dam site and diversion tunnel entrance as viewed from bridge north of site, October 7, 1924
Bonanza Peak viewed from lower Lyman Lake, n.d.
116. Bonanza Peak viewed from lower Lyman Lake, n.d.

Pencil sketch ofthe lower bridge, Tumwater, June 10, 1900
117. Pencil sketch ofthe lower bridge, Tumwater, June 10, 1900
Louis Dechmann walking with two daughters, Louise and Marie, in the garden at the Qui Si Sana Sanatorium
118. Louis Dechmann walking with two daughters, Louise and Marie, in the garden at the Qui Si Sana Sanatorium and Biological Institution, 1913
Bedrock on the lower slope of Mount Baker, ca. 1930
119. Bedrock on the lower slope of Mount Baker, ca. 1930
Homestead in the vicinity of lower Humptulips River, Olympic Peninsula, Washington, ca. 1895
120. Homestead in the vicinity of lower Humptulips River, Olympic Peninsula, Washington, ca. 1895
select all : clear all : add to favorites
results 101-120 of 1250 item(s)  page 6 of 63 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^