High tension room on east side of powerhouse showing potential and current transformers, November 2,
61. High tension room on east side of powerhouse showing potential and current transformers, November 2, 1911
President John F. Kennedy initiates groundbreaking of the N-Reactor at Hanford Nuclear Reservation, Richland,
62. President John F. Kennedy initiates groundbreaking of the N-Reactor at Hanford Nuclear Reservation, Richland, Washington, September 26, 1963
President John F. Kennedy addresses crowd, at the Hanford Nuclear Reservation, Richland, Washington,
63. President John F. Kennedy addresses crowd, at the Hanford Nuclear Reservation, Richland, Washington, September 26, 1963
Machinery in basement of White River powerhouse, April 12, 1912
64. Machinery in basement of White River powerhouse, April 12, 1912

Interior of Puget Sound Traction, Light and Power Company cottage near the powerhouse, vicnity of Dieringer,
65. Interior of Puget Sound Traction, Light and Power Company cottage near the powerhouse, vicnity of Dieringer, April 12, 1912
Looking west along the tailrace from the powerhouse site toward the Stuck River showing main construction
66. Looking west along the tailrace from the powerhouse site toward the Stuck River showing main construction camp on right, September 22, 1911
Puget Sound Traction, Light and Power Company cottages near the powerhouse, vicnity of Dieringer, April
67. Puget Sound Traction, Light and Power Company cottages near the powerhouse, vicnity of Dieringer, April 12, 1912
Installation of steel Y-shaped tunnels underneath standpipes, October 15, 1924
68. Installation of steel Y-shaped tunnels underneath standpipes, October 15, 1924

Flume line trestle construction, June 9, 1903
69. Flume line trestle construction, June 9, 1903
Man posed next to turbine water wheel in powerhouse, with pressure regulators to the right, n.d.
70. Man posed next to turbine water wheel in powerhouse, with pressure regulators to the right, n.d.
Air pipe installation for penstocks next to powerhouse, September 7, 1911
71. Air pipe installation for penstocks next to powerhouse, September 7, 1911
Fourth penstock installed between standpipe and powerhouse, October 15, 1924
72. Fourth penstock installed between standpipe and powerhouse, October 15, 1924

Steam shovel excavating powerhouse site near Dieringer, January 16, 1911
73. Steam shovel excavating powerhouse site near Dieringer, January 16, 1911
Allis-Chalmers water wheel no. 2 installed in powerhouse, October 17, 1911
74. Allis-Chalmers water wheel no. 2 installed in powerhouse, October 17, 1911
Steam shovel excavating the tailrace next to powerhouse, August 31, 1911
75. Steam shovel excavating the tailrace next to powerhouse, August 31, 1911
Construction camp no. 8, May 30, 1903
76. Construction camp no. 8, May 30, 1903

Powerhouse site and incline railway near Dieringer, May 16, 1910
77. Powerhouse site and incline railway near Dieringer, May 16, 1910
Switches on the roof of the powerhouse, November 2, 1911
78. Switches on the roof of the powerhouse, November 2, 1911
Installing the penstocks in the tunnels, July 20, 1911
79. Installing the penstocks in the tunnels, July 20, 1911
Trestle no. 4 on the cable incline from below, June 2, 1903
80. Trestle no. 4 on the cable incline from below, June 2, 1903
select all : clear all : add to favorites
results 61-80 of 1119 item(s)  page 4 of 56 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next