University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Interior--Deserted   
Refine your search

Try Search all Collections


results 41-60 of 14881 item(s)  page 3 of 745 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Left bank with engineering notes showing plans to raise the height of Ross Dam, September 14, 1944
41. Left bank with engineering notes showing plans to raise the height of Ross Dam, September 14, 1944
Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
42. Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
Men reading the pressure gauge on a steel pipe, January 26, 1900
43. Men reading the pressure gauge on a steel pipe, January 26, 1900
Powerhouse interior showing generating unit installation, February 19, 1912
44. Powerhouse interior showing generating unit installation, February 19, 1912

Incline railroad used for moving gravel, east of the dam site, October 7, 1924
45. Incline railroad used for moving gravel, east of the dam site, October 7, 1924
Excavation for foundation of dam, with cofferdam visible, October 7, 1924
46. Excavation for foundation of dam, with cofferdam visible, October 7, 1924
Remaining portion of partially destroyed cofferdam after a flood, November 19, 1924
47. Remaining portion of partially destroyed cofferdam after a flood, November 19, 1924
Southern face of dam, showing excavation for east abutment on the right side, September 12, 1925
48. Southern face of dam, showing excavation for east abutment on the right side, September 12, 1925

Men and steam shovel working on powerhouse site excavation, April 26, 1925
49. Men and steam shovel working on powerhouse site excavation, April 26, 1925
Looking down main pressure tunnel from tunnel entrance, November 3, 1924
50. Looking down main pressure tunnel from tunnel entrance, November 3, 1924
Dam site showing chutes for carrying concrete, October 1, 1924
51. Dam site showing chutes for carrying concrete, October 1, 1924
Building cofferdam in preparation for building Lower Baker River Dam, August 28, 1924
52. Building cofferdam in preparation for building Lower Baker River Dam, August 28, 1924

Dam construction after Baker River was blocked off by upper cofferdam, August 28, 1924
53. Dam construction after Baker River was blocked off by upper cofferdam, August 28, 1924
Hoist used for hauling gravel up slope next to the dam site, August 28, 1924
54. Hoist used for hauling gravel up slope next to the dam site, August 28, 1924
Steam shovel, next to locomotive, removing earth from dam site, August 28, 1924
55. Steam shovel, next to locomotive, removing earth from dam site, August 28, 1924
Man standing in completed penstock tunnel between dam and powerhouse, October 22, 1925
56. Man standing in completed penstock tunnel between dam and powerhouse, October 22, 1925

Forms for the creation of the main tunnel, in the center of the tunnel system, May 7, 1925
57. Forms for the creation of the main tunnel, in the center of the tunnel system, May 7, 1925
Draft tube that will go under one of the powerhouse water wheels, pictured after delivery in town next
58. Draft tube that will go under one of the powerhouse water wheels, pictured after delivery in town next to the warehouse, February 7, 1925
Workers on powerhouse roof laying rebar, August 3, 1925
59. Workers on powerhouse roof laying rebar, August 3, 1925
Form for water wheel draft tube, after delivery to Concrete, March 20, 1925
60. Form for water wheel draft tube, after delivery to Concrete, March 20, 1925
select all : clear all : add to favorites
results 41-60 of 14881 item(s)  page 3 of 745 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^