University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for House--Deserted   
Refine your search

Try Search all Collections


results 61-80 of 15368 item(s)  page 4 of 769 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Excavation for foundation of dam, with cofferdam visible, October 7, 1924
61. Excavation for foundation of dam, with cofferdam visible, October 7, 1924
Remaining portion of partially destroyed cofferdam after a flood, November 19, 1924
62. Remaining portion of partially destroyed cofferdam after a flood, November 19, 1924
Railroad cars carrying lumber at the powerhouse site, August 3, 1903
63. Railroad cars carrying lumber at the powerhouse site, August 3, 1903
Southern face of dam, showing excavation for east abutment on the right side, September 12, 1925
64. Southern face of dam, showing excavation for east abutment on the right side, September 12, 1925

Men and steam shovel working on powerhouse site excavation, April 26, 1925
65. Men and steam shovel working on powerhouse site excavation, April 26, 1925
Looking down main pressure tunnel from tunnel entrance, November 3, 1924
66. Looking down main pressure tunnel from tunnel entrance, November 3, 1924
Dam site showing chutes for carrying concrete, October 1, 1924
67. Dam site showing chutes for carrying concrete, October 1, 1924
Building cofferdam in preparation for building Lower Baker River Dam, August 28, 1924
68. Building cofferdam in preparation for building Lower Baker River Dam, August 28, 1924

Dam construction after Baker River was blocked off by upper cofferdam, August 28, 1924
69. Dam construction after Baker River was blocked off by upper cofferdam, August 28, 1924
Hoist used for hauling gravel up slope next to the dam site, August 28, 1924
70. Hoist used for hauling gravel up slope next to the dam site, August 28, 1924
Steam shovel, next to locomotive, removing earth from dam site, August 28, 1924
71. Steam shovel, next to locomotive, removing earth from dam site, August 28, 1924
Man standing in completed penstock tunnel between dam and powerhouse, October 22, 1925
72. Man standing in completed penstock tunnel between dam and powerhouse, October 22, 1925

Forms for the creation of the main tunnel, in the center of the tunnel system, May 7, 1925
73. Forms for the creation of the main tunnel, in the center of the tunnel system, May 7, 1925
Draft tube that will go under one of the powerhouse water wheels, pictured after delivery in town next
74. Draft tube that will go under one of the powerhouse water wheels, pictured after delivery in town next to the warehouse, February 7, 1925
Workers on powerhouse roof laying rebar, August 3, 1925
75. Workers on powerhouse roof laying rebar, August 3, 1925
Form for water wheel draft tube, after delivery to Concrete, March 20, 1925
76. Form for water wheel draft tube, after delivery to Concrete, March 20, 1925

South face of dam under construction, February 27, 1925
77. South face of dam under construction, February 27, 1925
Excavation for powerhouse foundation, March 6, 1925
78. Excavation for powerhouse foundation, March 6, 1925
Generating units 1 and 2 installed in the powerhouse, August 26, 1925
79. Generating units 1 and 2 installed in the powerhouse, August 26, 1925
Powerhouse interior showing generating unit no. 2, August 13, 1925
80. Powerhouse interior showing generating unit no. 2, August 13, 1925
select all : clear all : add to favorites
results 61-80 of 15368 item(s)  page 4 of 769 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^