University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Barry--Entrance   
Refine your search

Try Search all Collections


results 21-40 of 13254 item(s)  page 2 of 663 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Puget Sound Traction, Light and Power Company cottages near the powerhouse, vicnity of Dieringer, April
21. Puget Sound Traction, Light and Power Company cottages near the powerhouse, vicnity of Dieringer, April 12, 1912
Installation of steel Y-shaped tunnels underneath standpipes, October 15, 1924
22. Installation of steel Y-shaped tunnels underneath standpipes, October 15, 1924
Rear view of powerhouse showing newly constructed air tanks for the fourth generating unit, February
23. Rear view of powerhouse showing newly constructed air tanks for the fourth generating unit, February 26, 1925
Interior of powerhouse with fourth generating unit installed, February 26, 1925
24. Interior of powerhouse with fourth generating unit installed, February 26, 1925

Construction on the addition to the south end of the powerhouse, April 24, 1924
25. Construction on the addition to the south end of the powerhouse, April 24, 1924
Building embankment trestle for construction of Printz Basin, November 1, 1910
26. Building embankment trestle for construction of Printz Basin, November 1, 1910
Fourth penstock installed between standpipe and powerhouse, October 15, 1924
27. Fourth penstock installed between standpipe and powerhouse, October 15, 1924
Scrapers grading the site for the dam at Dingle Basin, May 31, 1910
28. Scrapers grading the site for the dam at Dingle Basin, May 31, 1910

Steam shovel digging canal to Lake Tapps, June 16, 1910
29. Steam shovel digging canal to Lake Tapps, June 16, 1910
Railroad locomotive with load of wood and lumber at top of incline near powerhouse, May 31, 1910
30. Railroad locomotive with load of wood and lumber at top of incline near powerhouse, May 31, 1910
Construction camp no. 8, May 30, 1903
31. Construction camp no. 8, May 30, 1903
Nearly completed south addition to powerhouse, August 26, 24
32. Nearly completed south addition to powerhouse, August 26, 24

Drawing of Skagit River Power Project plan, ca. 1930
33. Drawing of Skagit River Power Project plan, ca. 1930
Site of Ross powerhouse and gauging station, June 28, 1919
34. Site of Ross powerhouse and gauging station, June 28, 1919
Massachusetts Street Substation exterior and high tension lines, Seattle, May 14, 1904
35. Massachusetts Street Substation exterior and high tension lines, Seattle, May 14, 1904
Timber lining of flume under construction, May 6, 1911
36. Timber lining of flume under construction, May 6, 1911

Left bank with engineering notes showing plans to raise the height of Ross Dam, September 14, 1944
37. Left bank with engineering notes showing plans to raise the height of Ross Dam, September 14, 1944
Men at entrance to concrete tunnel at Masonry Dam, April 7, 1913
38. Men at entrance to concrete tunnel at Masonry Dam, April 7, 1913
Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
39. Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
Men reading the pressure gauge on a steel pipe, January 26, 1900
40. Men reading the pressure gauge on a steel pipe, January 26, 1900
select all : clear all : add to favorites
results 21-40 of 13254 item(s)  page 2 of 663 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^