101.
Workers on powerhouse roof laying rebar, August 3, 1925
102.
Form for water wheel draft tube, after delivery to Concrete, March 20, 1925
103.
South face of dam under construction, February 27, 1925
104.
Excavation for powerhouse foundation, March 6, 1925
105.
Generating units 1 and 2 installed in the powerhouse, August 26, 1925
106.
Powerhouse interior showing generating unit no. 2, August 13, 1925
107.
Powerhouse under construction, June 29, 1925
108.
Dam under construction, with concrete being placed on the east side, July 19, 1925
109.
Gate pier construction on top of the dam, August 12, 1925
110.
Crane in operation, looking south from dam site, August 28, 1924
111.
Construction of southern face of dam, August 3, 1925
112.
Workers on the roof of the powerhouse laying rebar, August 3, 1925
113.
Man in surge chamber before penstock tunnel was opened for operation, October 22, 1925
114.
Bridge and entrance to tunnel at the dam site, May 29, 1924
115.
Reinforcing mat and rock formation that will be below the no. 1 generating unit in the powerhouse, May 8, 1925
116.
Men placing penstocks into position in the penstock tunnel, June 21, 1925
117.
North face of dam being built, July 3, 1925
118.
Men at north end of penstocks that connect to the powerhouse, June 13, 1925
119.
North side of dam during construction, June 20, 1925
120.
Dam under construction, south side, June 20, 1925
select all
:
clear all
:
add to favorites
results
101
-
120
of
15417
item(s)
page 6 of 771 : (
<<
1
2
3
4
5
6
7
8
9
10
>>
) ::
previous
:
next
Contact Us
|
Change display settings
|
About
|
Make a Gift
|
Privacy
^ to top ^
©
University of Washington Libraries
Subscribe to Updates