Powerhouse interior showing generating unit no. 2, August 13, 1925
81. Powerhouse interior showing generating unit no. 2, August 13, 1925
Powerhouse under construction, June 29, 1925
82. Powerhouse under construction, June 29, 1925
Dam under construction, with concrete being placed on the east side, July 19, 1925
83. Dam under construction, with concrete being placed on the east side, July 19, 1925
Gate pier construction on top of the dam, August 12, 1925
84. Gate pier construction on top of the dam, August 12, 1925

Crane in operation, looking south from dam site, August 28, 1924
85. Crane in operation, looking south from dam site, August 28, 1924
Construction of southern face of dam, August 3, 1925
86. Construction of southern face of dam, August 3, 1925
Workers on the roof of the powerhouse laying rebar, August 3, 1925
87. Workers on the roof of the powerhouse laying rebar, August 3, 1925
Man in surge chamber before penstock tunnel was opened for operation, October 22, 1925
88. Man in surge chamber before penstock tunnel was opened for operation, October 22, 1925

Bridge and entrance to tunnel at the dam site, May 29, 1924
89. Bridge and entrance to tunnel at the dam site, May 29, 1924
Reinforcing mat and rock formation that will be below the no. 1 generating unit in the powerhouse, May
90. Reinforcing mat and rock formation that will be below the no. 1 generating unit in the powerhouse, May 8, 1925
Men placing penstocks into position in the penstock tunnel, June 21, 1925
91. Men placing penstocks into position in the penstock tunnel, June 21, 1925
North face of dam being built, July 3, 1925
92. North face of dam being built, July 3, 1925

Men at north end of penstocks that connect to the powerhouse, June 13, 1925
93. Men at north end of penstocks that connect to the powerhouse, June 13, 1925
North side of dam during construction, June 20, 1925
94. North side of dam during construction, June 20, 1925
Dam under construction, south side, June 20, 1925
95. Dam under construction, south side, June 20, 1925
Man standing in concrete-lined tunnel between dam and the four penstocks going to the powerhouse, October
96. Man standing in concrete-lined tunnel between dam and the four penstocks going to the powerhouse, October 22, 1925

Men in the main pressure tunnel installing the sluice pipe, September 8, 1925
97. Men in the main pressure tunnel installing the sluice pipe, September 8, 1925
North side of dam with gate guides in place, September 12, 1925
98. North side of dam with gate guides in place, September 12, 1925
Powerhouse and dam during construction process, September 12, 1925
99. Powerhouse and dam during construction process, September 12, 1925
Building sawmill at northernmost arm of Lake Tapps near outlet, June 15, 1910
100. Building sawmill at northernmost arm of Lake Tapps near outlet, June 15, 1910
select all : clear all : add to favorites
results 81-100 of 16145 item(s)  page 5 of 808 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^