University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for 523).   
Refine your search

Try Search all Collections


results 101-120 of 87840 item(s)  page 6 of 4392 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Control room, Diablo Powerhouse, July 1989
101. Control room, Diablo Powerhouse, July 1989
Setting the turbine runner in place, Diablo Powerhouse interior, May 5, 1936
102. Setting the turbine runner in place, Diablo Powerhouse interior, May 5, 1936
Powerhouse interior showing placement of water wheel for generating unit no. 3 using 50-ton crane, June
103. Powerhouse interior showing placement of water wheel for generating unit no. 3 using 50-ton crane, June 8, 1904
Gorge Powerhouse showing Mount Ross to the north, ca. 1930
104. Gorge Powerhouse showing Mount Ross to the north, ca. 1930

Rear view of powerhouse showing pressure tanks, standpipes and flume, February 19, 1912
105. Rear view of powerhouse showing pressure tanks, standpipes and flume, February 19, 1912
Men constructing a section of a wooden stave pipe in a trench, March 9, 1900
106. Men constructing a section of a wooden stave pipe in a trench, March 9, 1900
Group photograph of men associated with the Cedar River pipeline construction project, March 8, 1900
107. Group photograph of men associated with the Cedar River pipeline construction project, March 8, 1900
Man standing on cofferdam pipe discharge, Masonry Dam, April 16, 1912
108. Man standing on cofferdam pipe discharge, Masonry Dam, April 16, 1912

Tunnels going from Lake Tapps outlet canal to powerhouse, November 1, 1910
109. Tunnels going from Lake Tapps outlet canal to powerhouse, November 1, 1910
Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
110. Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
Installation of wooden stave pipe with iron hoops in trench, January 26, 1900
111. Installation of wooden stave pipe with iron hoops in trench, January 26, 1900
Workers fastening iron hoops around wood stave pipe, January 26, 1900
112. Workers fastening iron hoops around wood stave pipe, January 26, 1900

Laying pipe in trench in the riverbed of the Black River, ca. 1899
113. Laying pipe in trench in the riverbed of the Black River, ca. 1899
Pipeline trench through Dunlap Canyon near Renton, ca. 1899
114. Pipeline trench through Dunlap Canyon near Renton, ca. 1899
Start of Landsburg headworks construction on the Cedar River, September 6, 1899
115. Start of Landsburg headworks construction on the Cedar River, September 6, 1899
Man with wrench viewing pressure gauge during test at end of steel pipe, January 12, 1900
116. Man with wrench viewing pressure gauge during test at end of steel pipe, January 12, 1900

Workers laying steel pipe near the Black River, west of Renton, ca. 1899
117. Workers laying steel pipe near the Black River, west of Renton, ca. 1899
Headworks construction at Landsburg on the Cedar River, September 6, 1899
118. Headworks construction at Landsburg on the Cedar River, September 6, 1899
Steel pipe after completing a pressure test, probably in Seattle or Renton, January 12, 1900
119. Steel pipe after completing a pressure test, probably in Seattle or Renton, January 12, 1900
Construction of powerhouse, May 30, 1911
120. Construction of powerhouse, May 30, 1911
select all : clear all : add to favorites
results 101-120 of 87840 item(s)  page 6 of 4392 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^