University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for --Jules   
Refine your search

Try Search all Collections


results 61-80 of 12571 item(s)  page 4 of 629 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Generating units 1 and 2 installed in the powerhouse, August 26, 1925
61. Generating units 1 and 2 installed in the powerhouse, August 26, 1925
Powerhouse interior showing generating unit no. 2, August 13, 1925
62. Powerhouse interior showing generating unit no. 2, August 13, 1925
Powerhouse under construction, June 29, 1925
63. Powerhouse under construction, June 29, 1925
Dam under construction, with concrete being placed on the east side, July 19, 1925
64. Dam under construction, with concrete being placed on the east side, July 19, 1925

Gate pier construction on top of the dam, August 12, 1925
65. Gate pier construction on top of the dam, August 12, 1925
Crane in operation, looking south from dam site, August 28, 1924
66. Crane in operation, looking south from dam site, August 28, 1924
Construction of southern face of dam, August 3, 1925
67. Construction of southern face of dam, August 3, 1925
Workers on the roof of the powerhouse laying rebar, August 3, 1925
68. Workers on the roof of the powerhouse laying rebar, August 3, 1925

Man in surge chamber before penstock tunnel was opened for operation, October 22, 1925
69. Man in surge chamber before penstock tunnel was opened for operation, October 22, 1925
Bridge and entrance to tunnel at the dam site, May 29, 1924
70. Bridge and entrance to tunnel at the dam site, May 29, 1924
Reinforcing mat and rock formation that will be below the no. 1 generating unit in the powerhouse, May
71. Reinforcing mat and rock formation that will be below the no. 1 generating unit in the powerhouse, May 8, 1925
Men placing penstocks into position in the penstock tunnel, June 21, 1925
72. Men placing penstocks into position in the penstock tunnel, June 21, 1925

North face of dam being built, July 3, 1925
73. North face of dam being built, July 3, 1925
Men at north end of penstocks that connect to the powerhouse, June 13, 1925
74. Men at north end of penstocks that connect to the powerhouse, June 13, 1925
North side of dam during construction, June 20, 1925
75. North side of dam during construction, June 20, 1925
Dam under construction, south side, June 20, 1925
76. Dam under construction, south side, June 20, 1925

Man standing in concrete-lined tunnel between dam and the four penstocks going to the powerhouse, October
77. Man standing in concrete-lined tunnel between dam and the four penstocks going to the powerhouse, October 22, 1925
Men in the main pressure tunnel installing the sluice pipe, September 8, 1925
78. Men in the main pressure tunnel installing the sluice pipe, September 8, 1925
North side of dam with gate guides in place, September 12, 1925
79. North side of dam with gate guides in place, September 12, 1925
Powerhouse and dam during construction process, September 12, 1925
80. Powerhouse and dam during construction process, September 12, 1925
select all : clear all : add to favorites
results 61-80 of 12571 item(s)  page 4 of 629 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^