University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for States--Alaska--Port   
Refine your search

Try Search all Collections


results 161-180 of 99028 item(s)  page 9 of 4952 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Men at entrance to concrete tunnel at Masonry Dam, April 7, 1913
161. Men at entrance to concrete tunnel at Masonry Dam, April 7, 1913
North facade of Newhalem powerhouse with tailrace on the right, July 1987
162. North facade of Newhalem powerhouse with tailrace on the right, July 1987
Detail of taintor gates from upstream on north end of Diablo Dam, July 1989
163. Detail of taintor gates from upstream on north end of Diablo Dam, July 1989
Butterfly valve as seen from inside the scroll case in Ross Powerhouse, July 1987
164. Butterfly valve as seen from inside the scroll case in Ross Powerhouse, July 1987

Diablo Dam incline railway powerhouse, at top of incline on Sourdough Mountain, July 1989
165. Diablo Dam incline railway powerhouse, at top of incline on Sourdough Mountain, July 1989
Tourist room in a construction camp bunkhouse, Newhalem, 19
166. Tourist room in a construction camp bunkhouse, Newhalem, 19
Diablo Incline Railway, with waiting room in foreground, July 1989
167. Diablo Incline Railway, with waiting room in foreground, July 1989
Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July
168. Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July 1989

Laying cement in the switchyard, where the transformers will be located, for the Diablo Powerhouse, May
169. Laying cement in the switchyard, where the transformers will be located, for the Diablo Powerhouse, May 1935
Visitors' lobby of the Diablo Powerhouse, July 1989
170. Visitors' lobby of the Diablo Powerhouse, July 1989
Men working on pile drivers, May 30, 1903
171. Men working on pile drivers, May 30, 1903
Transmission line poles east of Sumner, August 10, 1903
172. Transmission line poles east of Sumner, August 10, 1903

Conduit in floor slab of Diablo Powerhouse, April 1936
173. Conduit in floor slab of Diablo Powerhouse, April 1936
Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
174. Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
Turbine before installation in the powerhouse, Cedar River, ca. 1900
175. Turbine before installation in the powerhouse, Cedar River, ca. 1900
Pipeline in Dunlap Canyon being tested, March 9, 1900
176. Pipeline in Dunlap Canyon being tested, March 9, 1900

Inside view of a section of wooden stave pipe during testing, March 8, 1900
177. Inside view of a section of wooden stave pipe during testing, March 8, 1900
Man applying molten lead to main water pipeline joints near Queen Anne standpipe, September 8, 1899
178. Man applying molten lead to main water pipeline joints near Queen Anne standpipe, September 8, 1899
Experimental reservoir, probably next to high reservoir site, Seattle, September 8, 1899
179. Experimental reservoir, probably next to high reservoir site, Seattle, September 8, 1899
Men inside and on top of wooden stave pipe during installation, January 26, 1900
180. Men inside and on top of wooden stave pipe during installation, January 26, 1900
select all : clear all : add to favorites
results 161-180 of 99028 item(s)  page 9 of 4952 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^