University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for States--Illinois--Chicago   
Refine your search

Try Search all Collections


results 161-180 of 99060 item(s)  page 9 of 4953 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Detail of taintor gates from upstream on north end of Diablo Dam, July 1989
161. Detail of taintor gates from upstream on north end of Diablo Dam, July 1989
Butterfly valve as seen from inside the scroll case in Ross Powerhouse, July 1987
162. Butterfly valve as seen from inside the scroll case in Ross Powerhouse, July 1987
Diablo Dam incline railway powerhouse, at top of incline on Sourdough Mountain, July 1989
163. Diablo Dam incline railway powerhouse, at top of incline on Sourdough Mountain, July 1989
Tourist room in a construction camp bunkhouse, Newhalem, 19
164. Tourist room in a construction camp bunkhouse, Newhalem, 19

Diablo Incline Railway, with waiting room in foreground, July 1989
165. Diablo Incline Railway, with waiting room in foreground, July 1989
Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July
166. Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July 1989
Laying cement in the switchyard, where the transformers will be located, for the Diablo Powerhouse, May
167. Laying cement in the switchyard, where the transformers will be located, for the Diablo Powerhouse, May 1935
Visitors' lobby of the Diablo Powerhouse, July 1989
168. Visitors' lobby of the Diablo Powerhouse, July 1989

Men working on pile drivers, May 30, 1903
169. Men working on pile drivers, May 30, 1903
Transmission line poles east of Sumner, August 10, 1903
170. Transmission line poles east of Sumner, August 10, 1903
Conduit in floor slab of Diablo Powerhouse, April 1936
171. Conduit in floor slab of Diablo Powerhouse, April 1936
Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
172. Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935

Turbine before installation in the powerhouse, Cedar River, ca. 1900
173. Turbine before installation in the powerhouse, Cedar River, ca. 1900
Pipeline in Dunlap Canyon being tested, March 9, 1900
174. Pipeline in Dunlap Canyon being tested, March 9, 1900
Inside view of a section of wooden stave pipe during testing, March 8, 1900
175. Inside view of a section of wooden stave pipe during testing, March 8, 1900
Man applying molten lead to main water pipeline joints near Queen Anne standpipe, September 8, 1899
176. Man applying molten lead to main water pipeline joints near Queen Anne standpipe, September 8, 1899

Experimental reservoir, probably next to high reservoir site, Seattle, September 8, 1899
177. Experimental reservoir, probably next to high reservoir site, Seattle, September 8, 1899
Men inside and on top of wooden stave pipe during installation, January 26, 1900
178. Men inside and on top of wooden stave pipe during installation, January 26, 1900
Dam, headworks and intake area under construction, November 14, 1899
179. Dam, headworks and intake area under construction, November 14, 1899
Confluence of Cedar and Black Rivers, showing dam which will divert Cedar River toward Lake Washington,
180. Confluence of Cedar and Black Rivers, showing dam which will divert Cedar River toward Lake Washington, ca. 1899
select all : clear all : add to favorites
results 161-180 of 99060 item(s)  page 9 of 4953 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^