University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for States--Alaska--Nunatak   
Refine your search

Try Search all Collections


results 181-200 of 99024 item(s)  page 10 of 4952 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Diablo Incline Railway, with waiting room in foreground, July 1989
181. Diablo Incline Railway, with waiting room in foreground, July 1989
Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July
182. Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July 1989
Laying cement in the switchyard, where the transformers will be located, for the Diablo Powerhouse, May
183. Laying cement in the switchyard, where the transformers will be located, for the Diablo Powerhouse, May 1935
Visitors' lobby of the Diablo Powerhouse, July 1989
184. Visitors' lobby of the Diablo Powerhouse, July 1989

Men working on pile drivers, May 30, 1903
185. Men working on pile drivers, May 30, 1903
Transmission line poles east of Sumner, August 10, 1903
186. Transmission line poles east of Sumner, August 10, 1903
Conduit in floor slab of Diablo Powerhouse, April 1936
187. Conduit in floor slab of Diablo Powerhouse, April 1936
Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
188. Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935

Turbine before installation in the powerhouse, Cedar River, ca. 1900
189. Turbine before installation in the powerhouse, Cedar River, ca. 1900
Pipeline in Dunlap Canyon being tested, March 9, 1900
190. Pipeline in Dunlap Canyon being tested, March 9, 1900
Inside view of a section of wooden stave pipe during testing, March 8, 1900
191. Inside view of a section of wooden stave pipe during testing, March 8, 1900
Man applying molten lead to main water pipeline joints near Queen Anne standpipe, September 8, 1899
192. Man applying molten lead to main water pipeline joints near Queen Anne standpipe, September 8, 1899

Experimental reservoir, probably next to high reservoir site, Seattle, September 8, 1899
193. Experimental reservoir, probably next to high reservoir site, Seattle, September 8, 1899
Men inside and on top of wooden stave pipe during installation, January 26, 1900
194. Men inside and on top of wooden stave pipe during installation, January 26, 1900
Dam, headworks and intake area under construction, November 14, 1899
195. Dam, headworks and intake area under construction, November 14, 1899
Confluence of Cedar and Black Rivers, showing dam which will divert Cedar River toward Lake Washington,
196. Confluence of Cedar and Black Rivers, showing dam which will divert Cedar River toward Lake Washington, ca. 1899

Panorama of Masonry Dam under construction, March 17, 1914
197. Panorama of Masonry Dam under construction, March 17, 1914
Cofferdam construction at the Lake Tapps outlet, April 4, 1911
198. Cofferdam construction at the Lake Tapps outlet, April 4, 1911
Cedar River as viewed from Clifford's Bridge near Landsburg headworks site, ca. 1899
199. Cedar River as viewed from Clifford's Bridge near Landsburg headworks site, ca. 1899
Men with shovels digging a trench across the Black River for the pipeline, October 13, 1899
200. Men with shovels digging a trench across the Black River for the pipeline, October 13, 1899
select all : clear all : add to favorites
results 181-200 of 99024 item(s)  page 10 of 4952 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^