University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Island--Uyak   
Refine your search

Try Search all Collections


results 141-160 of 96548 item(s)  page 8 of 4828 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Excavation in the Glory Hole at the Ruby Dam site, 1938
141. Excavation in the Glory Hole at the Ruby Dam site, 1938
Steam shovel excavating powerhouse foundation, February 2, 1911
142. Steam shovel excavating powerhouse foundation, February 2, 1911
Diablo Powerhouse interior showing the upper oil room with Sharples oil centrifuge, July 1989
143. Diablo Powerhouse interior showing the upper oil room with Sharples oil centrifuge, July 1989
Men at entrance to concrete tunnel at Masonry Dam, April 7, 1913
144. Men at entrance to concrete tunnel at Masonry Dam, April 7, 1913

North facade of Newhalem powerhouse with tailrace on the right, July 1987
145. North facade of Newhalem powerhouse with tailrace on the right, July 1987
Detail of taintor gates from upstream on north end of Diablo Dam, July 1989
146. Detail of taintor gates from upstream on north end of Diablo Dam, July 1989
Butterfly valve as seen from inside the scroll case in Ross Powerhouse, July 1987
147. Butterfly valve as seen from inside the scroll case in Ross Powerhouse, July 1987
Diablo Dam incline railway powerhouse, at top of incline on Sourdough Mountain, July 1989
148. Diablo Dam incline railway powerhouse, at top of incline on Sourdough Mountain, July 1989

Tourist room in a construction camp bunkhouse, Newhalem, 19
149. Tourist room in a construction camp bunkhouse, Newhalem, 19
Diablo Incline Railway, with waiting room in foreground, July 1989
150. Diablo Incline Railway, with waiting room in foreground, July 1989
Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July
151. Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July 1989
Laying cement in the switchyard, where the transformers will be located, for the Diablo Powerhouse, May
152. Laying cement in the switchyard, where the transformers will be located, for the Diablo Powerhouse, May 1935

Visitors' lobby of the Diablo Powerhouse, July 1989
153. Visitors' lobby of the Diablo Powerhouse, July 1989
Men working on pile drivers, May 30, 1903
154. Men working on pile drivers, May 30, 1903
Transmission line poles east of Sumner, August 10, 1903
155. Transmission line poles east of Sumner, August 10, 1903
Conduit in floor slab of Diablo Powerhouse, April 1936
156. Conduit in floor slab of Diablo Powerhouse, April 1936

Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
157. Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
Turbine before installation in the powerhouse, Cedar River, ca. 1900
158. Turbine before installation in the powerhouse, Cedar River, ca. 1900
Pipeline in Dunlap Canyon being tested, March 9, 1900
159. Pipeline in Dunlap Canyon being tested, March 9, 1900
Inside view of a section of wooden stave pipe during testing, March 8, 1900
160. Inside view of a section of wooden stave pipe during testing, March 8, 1900
select all : clear all : add to favorites
results 141-160 of 96548 item(s)  page 8 of 4828 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^