University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  
  Share
 
Search results for Lobbies--Hawaii--Honolulu--Designs   
Refine your search

Try Search all Collections


results 121-140 of 75771 item(s)  page 7 of 3789 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
North and west facades of the Diablo Powerhouse, July 1989
121. North and west facades of the Diablo Powerhouse, July 1989
Gorge Powerhouse interior, looking southwest at generator units 21, 22, and 23, July 1989
122. Gorge Powerhouse interior, looking southwest at generator units 21, 22, and 23, July 1989
Visitors' lobby of the Diablo Powerhouse, July 1989
123. Visitors' lobby of the Diablo Powerhouse, July 1989
Diablo Canyon looking downstream from valve house of dam, July 1989
124. Diablo Canyon looking downstream from valve house of dam, July 1989

Setting the turbine runner in place, Diablo Powerhouse interior, May 5, 1936
125. Setting the turbine runner in place, Diablo Powerhouse interior, May 5, 1936
Turbine shaft and runner, Diablo Powerhouse, Skagit River, April 28, 1936
126. Turbine shaft and runner, Diablo Powerhouse, Skagit River, April 28, 1936
Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
127. Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
Powerhouse foundation construction, March 16, 1911
128. Powerhouse foundation construction, March 16, 1911

Workers in the interior of the Cedar Falls Power House, probably October 17, 1912
129. Workers in the interior of the Cedar Falls Power House, probably October 17, 1912
Men constructing a section of a wooden stave pipe in a trench, March 9, 1900
130. Men constructing a section of a wooden stave pipe in a trench, March 9, 1900
Completed pipeline in Dunlap Canyon being tested, March 9, 1900
131. Completed pipeline in Dunlap Canyon being tested, March 9, 1900
Inside view of a section of wooden stave pipe during testing, March 8, 1900
132. Inside view of a section of wooden stave pipe during testing, March 8, 1900

Tramway used for transporting mortar into the high service reservoir during construction, City Park,
133. Tramway used for transporting mortar into the high service reservoir during construction, City Park, January 19, 1900
Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
134. Steel pipe on hill east of Renton with Black River and Lake Washington visible in background, ca. 1899
Bridge over the Cedar River near Renton, ca. 1899
135. Bridge over the Cedar River near Renton, ca. 1899
Men inside and on top of wooden stave pipe during installation, January 26, 1900
136. Men inside and on top of wooden stave pipe during installation, January 26, 1900

Trench where steel pipe wil be joined with wood stave pipe, vicinity of Renton, ca. 1899
137. Trench where steel pipe wil be joined with wood stave pipe, vicinity of Renton, ca. 1899
Laying pipe in trench in the riverbed of the Black River, ca. 1899
138. Laying pipe in trench in the riverbed of the Black River, ca. 1899
Steel pipe being installed in a trench, looking west toward Renton and the Black River, ca. September
139. Steel pipe being installed in a trench, looking west toward Renton and the Black River, ca. September 1899
Panorama of Masonry Dam under construction, March 17, 1914
140. Panorama of Masonry Dam under construction, March 17, 1914
select all : clear all : add to favorites
results 121-140 of 75771 item(s)  page 7 of 3789 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^