|
| Title | Intake at the diversion dam near Buckley, July 11, 1911 |
| Photographer | Unknown |
| Date | 1911 |
| Notes | Construction photographs of the White River Power Plant, a hydroelectric facility on the White River, built by the Pacific Coast Power Company, 1909-1911. This company was acquired by Puget Sound Traction, Light & Power Company in 1912.
Caption on image: Intake, looking west, J.O. 397, No. 479, 7-11-11.
PH Coll 269.854 |
| Location Depicted | United States--Washington (State)--White River Dam |
| Subjects (LCSH) | Diversion weirs--Washington (State); Intakes (Hydraulic engineering)--Washington (State) |
| Digital Collection | Seattle Power and Water Supply Collection
|
| Order Number | WWDL0165 |
| Ordering Information | To order a reproduction, inquire about permissions, or for information about prices see: http://www.lib.washington.edu/specialcollections/services/reproduction-info Please cite the Order Number when ordering. |
| Negative Number | Puget Power 854 |
| Repository | University of Washington Libraries. Special Collections Division |
| Repository Collection | Puget Sound Power and Light Company Photographs. PH Coll 269
|
| Object Type | Photograph |
| Physical Description | silver gelatin, b&w : 8 x 10 in. |
| Digital Reproduction Information | Scanned from a photographic print using a Microtek Scanmaker 9600XL at 115 dpi in JPEG format at compression rate 3 and resized to 768x600 ppi. 2005 |