Home
:
Favorites
:
Ordering and Use
:
Help
:
Blog
Special Collections
:
A-Z List
:
Subject List
:
Advanced Search
«
Seattle Power and Water Supply Collection
Visit the complete
Western Waters Digital Library
add to favorites
:
reference url
back to results
:
previous
:
next
Turbine before installation in the powerhouse, Cedar River, ca. 1900
Title
Turbine
before
installation
in the
powerhouse
,
Cedar
River
,
ca.
1900
Photographer
Unknown
Date
ca. 1900
Notes
Photographs
of the
City
of
Seattle
Cedar
Falls
Power
Plant
construction
,
1902-1905
Caption
below
photograph:
8000
horsepower
turbine
before
assembling.
PH
Coll
10.79
Location Depicted
United
States--Washington
(State)--King
County
Subjects (LCTGM)
Construction
workers--Washington
(State)
Subjects (LCSH)
Turbines--Washington
(State);
Turbines--Parts--Washington
(State);
Hydroelectric
power
plants--Washington
(State)--Design
and
construction
Digital Collection
Seattle Power and Water Supply Collection
Order Number
WWDL0595
Ordering Information
To order a reproduction, inquire about permissions, or for information about prices see:
http://www.lib.washington.edu/specialcollections/services/reproduction-info
Please cite the Order Number when ordering.
Repository
University of Washington Libraries. Special Collections Division
Repository Collection
Frank J. Morrill Photographs. PH Coll 10
Object Type
Photograph
Physical Description
silver gelatin, b&w : 6 x 8 in.
Digital Reproduction Information
Scanned from a photographic print using a Microtek Scanmaker 9600XL at 115 dpi in JPEG format at compression rate 3 and resized to 768x600 ppi. 2005
add to favorites
:
reference url
back to results
:
previous
:
next
Contact Us
|
Change display settings
|
About
|
Make a Gift
|
Privacy
^ to top ^
©
University of Washington Libraries
Subscribe to Updates