|
| Title | Bridges at the dam site and diversion tunnel entrance, June 30, 1924 |
| Photographer | Unknown |
| Date | 1924 |
| Notes | Construction photographs of the Lower Baker River Power Plant, built by the Puget Sound Power & Light Company, 1924-1925.
Caption on photograph: Bridge at Adit A and dam site, J.O. 4186, no. 22, 6-30-24
PH Coll 269.2628 |
| Location Depicted | United States--Washington (State)--Baker River |
| Subjects (LCTGM) | Rivers--Washington (State); Bridges--Washington (State); Tunnels--Washington (State); Dam construction--Washington (State) |
| Subjects (LCSH) | Baker River (Wash.) |
| Digital Collection | Seattle Power and Water Supply Collection
|
| Order Number | WWDL0451 |
| Ordering Information | To order a reproduction, inquire about permissions, or for information about prices see: http://www.lib.washington.edu/specialcollections/services/reproduction-info Please cite the Order Number when ordering. |
| Negative Number | Puget Power 2628 |
| Repository | University of Washington Libraries. Special Collections Division |
| Repository Collection | Puget Sound Power and Light Company Photographs. PH Coll 269
|
| Object Type | Photograph |
| Physical Description | silver gelatin, b&w : 8 x 10 in. |
| Digital Reproduction Information | Scanned from a photographic print using a Microtek Scanmaker 9600XL at 115 dpi in JPEG format at compression rate 3 and resized to 768x600 ppi. 2005 |