Home
:
Favorites
:
Ordering and Use
:
Help
:
Blog
Special Collections
:
A-Z List
:
Subject List
:
Advanced Search
«
Seattle Power and Water Supply Collection
Visit the complete
Western Waters Digital Library
add to favorites
:
reference url
back to results
:
previous
:
next
Diablo Dam Powerhouse under construction, July 16, 1931
Title
Diablo
Dam
Powerhouse
under
construction
,
July
16
,
1931
Photographer
Unknown
Date
1931
Notes
Photographs
of the
Skagit
River
Hydroelectric
Project
constructed
between
1918-1961.
The
Diablo
Dam
was
built
by
Seattle
City
Light
at a
location
7-1/2
miles
upstream
from
Newhalem
and
completed
August
27
,
1930.
Due
to the
Great
Depression
, the
Diablo
Powerhouse
was not
completed
until
1935
, with the
first
power
being
generated
in
1936.
Caption
on
image:
D(31-7-16)1
PH
Coll
45.210
Location Depicted
United
States--Washington
(State)--Skagit
River--Diablo
Dam
Powerhouse
Subjects (LCSH)
Hydroelectric
power
plants--Washington
(State)--Design
and
construction
Digital Collection
Seattle Power and Water Supply Collection
Order Number
WWDL0421
Ordering Information
To order a reproduction, inquire about permissions, or for information about prices see:
http://www.lib.washington.edu/specialcollections/services/reproduction-info
Please cite the Order Number when ordering.
Repository
University of Washington Libraries. Special Collections Division
Repository Collection
Seattle City Light Albums. PH Coll 45
Object Type
Photograph
Physical Description
silver gelatin, b&w
Digital Reproduction Information
Scanned from a photographic print using a Microtek Scanmaker 9600XL at 150 dpi in JPEG format at compression rate 3 and resized to 768x600 ppi. 2005
add to favorites
:
reference url
back to results
:
previous
:
next
Contact Us
|
Change display settings
|
About
|
Make a Gift
|
Privacy
^ to top ^
©
University of Washington Libraries
Subscribe to Updates