|
| Title | Winston Brothers Construction Company workers camp, Diablo Dam site, Mary 12, 1928 |
| Photographer | Unknown |
| Date | 1928 |
| Notes | Photographs of the Skagit River Hydroelectric Project constructed between 1918-1961.
The Diablo Dam was built by Seattle City Light at a location 7-1/2 miles upstream from Newhalem and completed August 27, 1930. Due to the Great Depression, the Diablo Powerhouse was not completed until 1935, with the first power being generated in 1936.
Work on the dam was carried out by the Winston Brothers Construction Company of Minneapolis with work beginning in 1927. Winston Brothers used quite a bit of their own railroad equipment on the project, including a 37 ton Shay locomotive.
Caption on image: D-28-3-12
Caption below image: Construction Camp - Winston Bros. Co., Diablo Dam Contractors
PH Coll 45.2-6 |
| Location Depicted | United States--Washington (State)--Skagit River--Diablo Dam |
| Subjects (LCTGM) | Work camps--Washington (State) |
| Subjects (LCSH) | Winston Bros. Company (Minneapolis, Minn.) |
| Digital Collection | Seattle Power and Water Supply Collection
|
| Order Number | WWDL0382 |
| Ordering Information | To order a reproduction, inquire about permissions, or for information about prices see: http://www.lib.washington.edu/specialcollections/services/reproduction-info Please cite the Order Number when ordering. |
| Negative Number | UW13126 |
| Repository | University of Washington Libraries. Special Collections Division |
| Repository Collection | Seattle City Light Albums. PH Coll 45
|
| Object Type | Photograph |
| Physical Description | silver gelatin, b&w |
| Digital Reproduction Information | Scanned from a photographic print using a Microtek Scanmaker 9600XL at 150 dpi in JPEG format at compression rate 3 and resized to 768x600 ppi. 2005 |