Home
:
Favorites
:
Ordering and Use
:
Help
:
Blog
Special Collections
:
A-Z List
:
Subject List
:
Advanced Search
«
Seattle Power and Water Supply Collection
Visit the complete
Western Waters Digital Library
add to favorites
:
reference url
back to results
:
previous
:
next
Interior of concrete-lined tunnel constructed to carry water from the Gorge Dam reservoir to the Powerhouse, September 21, 1923
Title
Interior
of
concrete-lined
tunnel
constructed
to
carry
water
from the
Gorge
Dam
reservoir
to the
Powerhouse
,
September
21
,
1923
Photographer
Unknown
Date
1923
Notes
Photographs
of the
Skagit
River
Hydroelectric
Project
constructed
between
1918-1961.
The
Gorge
Dam
and
Powerhouse
were
built
by
Seattle
City
Light
and
completed
in
September
of
1924.
Caption
on
image:
5183.
9-21-23
Caption
below
image:
Concrete
lined
tunnel
,
20
feet
,
6
inches
Diameter
PH
Coll
45.1-57
Location Depicted
United
States--Washington
(State)--Skagit
River--Gorge
Dam
Subjects (LCTGM)
Tunnels--Washington
(State)
Subjects (LCSH)
Concrete
construction--Washington
(State)
Digital Collection
Seattle Power and Water Supply Collection
Order Number
WWDL0362
Ordering Information
To order a reproduction, inquire about permissions, or for information about prices see:
http://www.lib.washington.edu/specialcollections/services/reproduction-info
Please cite the Order Number when ordering.
Repository
University of Washington Libraries. Special Collections Division
Repository Collection
Seattle City Light Albums. PH Coll 45
Object Type
Photograph
Physical Description
silver gelatin, b&w
Digital Reproduction Information
Scanned from a photographic print using a Microtek Scanmaker 9600XL at 150 dpi in JPEG format at compression rate 3 and resized to 768x600 ppi. 2005
add to favorites
:
reference url
back to results
:
previous
:
next
Contact Us
|
Change display settings
|
About
|
Make a Gift
|
Privacy
^ to top ^
©
University of Washington Libraries
Subscribe to Updates