|
| Title | Last shovelful of muck taken out of the Pioneer Tunnel with the Marion steam shovel, December 8, 1928 |
| Photographer | Pickett, Lee |
| Date | 1928 |
| Notes | Construction of the Cascade Tunnel for the Great Northern Railway.
Caption on image: The last shovel full of muck taken out of the G. N. Ry. Co. new 8 Mile Tunnel, Scenic to Berne Wn. with the Marion steam shovel. About 7 am, 12-8-28. A. Guthrie and Co., St. Paul, Minn. cont. Copyright 1928. Pickett, Index Wn. 4151 |
| Subjects (LCSH) | Pioneer Tunnel (Wash.); Railroad tunnels--Washington (State); Railroad construction workers--Washington (State) |
| Location Depicted | United States--Washington (State)--Scenic |
| Digital Collection | Lee Pickett Photographs
|
| Order Number | PIC1101
|
| Ordering Information | To order a reproduction, inquire about permissions, or for information about prices see: http://www.lib.washington.edu/specialcollections/services/reproduction-info Please cite the Order Number when ordering. |
| Negative Number | Pickett 4151 |
| Repository | University of Washington Libraries. Special Collections Division |
| Repository Collection | Lee Pickett Photograph Collection. PH Coll 580 |
| Object Type | Negative |
| Physical Description | nitrate, b/w ; 8 x 10 in. |
| Digital Reproduction Information | Scanned from a 8 x 10 in. nitrate negative using a Microtek Scanmaker 9600XL at 200 dpi in JPEG format at compression rate 3 and resized to 768 width ppi. 2002. |