University of Washington Libraries
Skip to content  Home : Favorites : Ordering and Use : Help : Blog   
Share
Digital Collections Special Collections : A-Z List : Subject List : Advanced Search  

« Architecture of the Pacific Northwest

add to favorites : reference url back to results : previous : next
 
Zoom in Zoom out Pan down Pan up Pan left Pan right Maximum resolution Fit in window Fit to width Rotate left Rotate right Hide/show thumbnail
Seattle Art Museum (Seattle, Wash.), September 1931 site plan
Seattle Art Museum (Seattle, Wash.), September 1931 site plan
TitleSeattle Art Museum (Seattle, Wash.), September 1931 site plan
Alternate TitleSeattle Asian Art Museum
Architectural Firm NameBebb & Gould
ArchitectsGould, Carl Freylinghausen, 1873-1939
Bebb, Charles H.
ClientArt Institute of Seattle
Date of Drawing Execution1931
Object TypeArchitectural drawings
Physical DescriptionGraphite and colored pencil on tracing paper: 45 x 51 cm.
Building Street AddressVolunteer Park
Building LocationUnited States--Washington (State)--Seattle
PurposeConceptual drawings
RepresentationSite plans
Descriptive NotesHandwritten below drawings:
Proposed Building for the Art Institute of Seattle
Bebb and Gould Architects
Hoge Bldg. Seattle
Sept 1931 J.P.J.

Scale: 1"=50'
Building StyleArt Deco
Building NotesAcross the span of Carl F. Gould's career in Seattle (1908-1939), architectural design moved from eclectic adaptations of historical models to the adoption of regional and nontraditional styles espoused by the Modern movement, and his buildings fully reflect this range of expression. Gould's design for the Seattle Art Museum was the first art museum in the country to be built in the modern style. His design development drawings for the museum are unique among those in the Gould collection for their precise dating. They reveal the design sequence from his earliest neoclassical efforts to his final modern solution. (Although Bebb remained Gould's partner and business adviser until the latter's death, after 1924 his influence in the firm declined substantially.) In 1991 a new museum was built in the downtown area and the Volunteer Park building became the Seattle Asian Art Museum.
Subjects (LCTGM)Site plans
Subjects (LCSH)Seattle Asian Art Museum; Art museums--Washington (State)--Seattle--Designs and plans
Digital CollectionArchitecture Collection
Digital ID NumberARC0669
Ordering InformationRestrictions apply to the ordering of this image. Please contact photos@u.washington.edu for more information.
RepositoryUniversity of Washington Libraries. Special Collections Division.
Repository CollectionCarl F. Gould Collection
Digital Reproduction InformationScanned from original drawing in RGB at 200-400 dpi, saved in TIFF format, changed to indexed color, enhanced and resized using Adobe Photoshop, and imported as JPEG2000 using Contentdm software's JPEG2000 Extension. 2006.
add to favorites : reference url back to results : previous : next
Contact Us | Change display settings | About | Make a Gift | Privacy ^ to top ^