Search results for Power   
Refine your search

Try Search all Collections


results 121-140 of 2659 item(s)  page 7 of 133 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Construction camp no. 8, May 30, 1903
121. Construction camp no. 8, May 30, 1903
Powerhouse site and incline railway near Dieringer, May 16, 1910
122. Powerhouse site and incline railway near Dieringer, May 16, 1910
Switches on the roof of the powerhouse, November 2, 1911
123. Switches on the roof of the powerhouse, November 2, 1911
Installing the penstocks in the tunnels, July 20, 1911
124. Installing the penstocks in the tunnels, July 20, 1911

Trestle no. 4 on the cable incline from below, June 2, 1903
125. Trestle no. 4 on the cable incline from below, June 2, 1903
Construction on flume line at site of a landslide, August 4, 1903
126. Construction on flume line at site of a landslide, August 4, 1903
Electron Plant powerhouse showing transformers in concrete cells, September 4, 1904
127. Electron Plant powerhouse showing transformers in concrete cells, September 4, 1904
First generator installed at the powerhouse, July 20, 1911
128. First generator installed at the powerhouse, July 20, 1911

Scraper at work on a cable incline, April 21, 1903
129. Scraper at work on a cable incline, April 21, 1903
Partially completed powerhouse with two generating units in operation, and views of nearby barn, house,
130. Partially completed powerhouse with two generating units in operation, and views of nearby barn, house, shop and penstocks, June 26, 1904
Junction of Seattle and Tacoma transmission lines, showing disconnecting switches, June 13, 1904
131. Junction of Seattle and Tacoma transmission lines, showing disconnecting switches, June 13, 1904
Main transformers in the powerhouse, November 2, 1911
132. Main transformers in the powerhouse, November 2, 1911

Transmission lines crossing Northern Pacific Railway tracks, June 9, 1904
133. Transmission lines crossing Northern Pacific Railway tracks, June 9, 1904
Massachusetts Street Substation exterior and high tension lines, Seattle, May 14, 1904
134. Massachusetts Street Substation exterior and high tension lines, Seattle, May 14, 1904
Massachusetts Street Substation interior showing high tension wiring and disconnecting switches, Seattle,
135. Massachusetts Street Substation interior showing high tension wiring and disconnecting switches, Seattle, May 14, 1904
Workers laying stringers on trestle, August 4, 1903
136. Workers laying stringers on trestle, August 4, 1903

Men working on pile drivers, May 30, 1903
137. Men working on pile drivers, May 30, 1903
Powerhouse interior showing placement of water wheel for generating unit no. 3 using 50-ton crane, June
138. Powerhouse interior showing placement of water wheel for generating unit no. 3 using 50-ton crane, June 8, 1904
Powerhouse interior showing placement of water wheel and rotor shaft in no. 3 generating unit bearings,
139. Powerhouse interior showing placement of water wheel and rotor shaft in no. 3 generating unit bearings, June 8, 1904
Powerhouse construction, May 15, 1911
140. Powerhouse construction, May 15, 1911
select all : clear all : add to favorites
results 121-140 of 2659 item(s)  page 7 of 133 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next

© University of Washington. All rights reserved.
The Community Museum is a project of community organizations and Tribes across the Olympic Peninsula and the University of Washington.
Support for the project comes from the Institute of Museum and Library Services and Preston, Gates and Ellis, LLP.