Search results for Restaurants--Alaska--Skagway;   
Refine your search

Try Search all Collections


results 81-100 of 75960 item(s)  page 5 of 3798 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Left bank with engineering notes showing plans to raise the height of Ross Dam, September 14, 1944
81. Left bank with engineering notes showing plans to raise the height of Ross Dam, September 14, 1944
Men at entrance to concrete tunnel at Masonry Dam, April 7, 1913
82. Men at entrance to concrete tunnel at Masonry Dam, April 7, 1913
North facade of Newhalem powerhouse with tailrace on the right, July 1987
83. North facade of Newhalem powerhouse with tailrace on the right, July 1987
Sawmill in operation on Lake Tapps, February 16, 1911
84. Sawmill in operation on Lake Tapps, February 16, 1911

Powerhouse construction site with views of penstock lines, camp no. 9, and superintendent's house, April
85. Powerhouse construction site with views of penstock lines, camp no. 9, and superintendent's house, April 18, 1904
Full view of Ross Dam, July 1987
86. Full view of Ross Dam, July 1987
Diablo Dam incline railway powerhouse, at top of incline on Sourdough Mountain, July 1989
87. Diablo Dam incline railway powerhouse, at top of incline on Sourdough Mountain, July 1989
Gorge Inn, formerly the mess hall for the Skagit Hydroelectric Project employees, Newhalem, July 1989
88. Gorge Inn, formerly the mess hall for the Skagit Hydroelectric Project employees, Newhalem, July 1989

Workers laying stringers on trestle, August 4, 1903
89. Workers laying stringers on trestle, August 4, 1903
Hydraulic mule used to open taintor gates on Diablo Dam, July 1989
90. Hydraulic mule used to open taintor gates on Diablo Dam, July 1989
Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July
91. Butterfly valve control, manufactured by the Pelton Water Wheel Company in 1931, Diablo Powerhouse, July 1989
Communications room, Diablo Powerhouse, July 1989
92. Communications room, Diablo Powerhouse, July 1989

Upper Cedar Falls, March 17, 1914
93. Upper Cedar Falls, March 17, 1914
Spillway no. 1 at the flume, December 31, 1903
94. Spillway no. 1 at the flume, December 31, 1903
Turbine pit, Diablo Powerhouse, July 1989
95. Turbine pit, Diablo Powerhouse, July 1989
Men working on pile drivers, May 30, 1903
96. Men working on pile drivers, May 30, 1903

Setting a section of the generator stator in place, Diablo Powerhouse interior, May 28, 1936
97. Setting a section of the generator stator in place, Diablo Powerhouse interior, May 28, 1936
Powerhouse interior showing placement of water wheel for generating unit no. 3 using 50-ton crane, June
98. Powerhouse interior showing placement of water wheel for generating unit no. 3 using 50-ton crane, June 8, 1904
Diablo Powerhouse and camp, Reflector Bar, Skagit River, October 1, 1935
99. Diablo Powerhouse and camp, Reflector Bar, Skagit River, October 1, 1935
Turbine before installation in the powerhouse, Cedar River, ca. 1900
100. Turbine before installation in the powerhouse, Cedar River, ca. 1900
select all : clear all : add to favorites
results 81-100 of 75960 item(s)  page 5 of 3798 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next

© University of Washington. All rights reserved.
The Community Museum is a project of community organizations and Tribes across the Olympic Peninsula and the University of Washington.
Support for the project comes from the Institute of Museum and Library Services and Preston, Gates and Ellis, LLP.