Search results for States--Alaska--Harriman   
Refine your search

Try Search all Collections


results 181-200 of 98724 item(s)  page 10 of 4937 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Conduit in floor slab of Diablo Powerhouse, April 1936
181. Conduit in floor slab of Diablo Powerhouse, April 1936
Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
182. Diablo Powerhouse interior with generator scroll cases in place, Skagit River, October 28,1935
Turbine before installation in the powerhouse, Cedar River, ca. 1900
183. Turbine before installation in the powerhouse, Cedar River, ca. 1900
Pipeline in Dunlap Canyon being tested, March 9, 1900
184. Pipeline in Dunlap Canyon being tested, March 9, 1900

Inside view of a section of wooden stave pipe during testing, March 8, 1900
185. Inside view of a section of wooden stave pipe during testing, March 8, 1900
Man applying molten lead to main water pipeline joints near Queen Anne standpipe, September 8, 1899
186. Man applying molten lead to main water pipeline joints near Queen Anne standpipe, September 8, 1899
Experimental reservoir, probably next to high reservoir site, Seattle, September 8, 1899
187. Experimental reservoir, probably next to high reservoir site, Seattle, September 8, 1899
Men inside and on top of wooden stave pipe during installation, January 26, 1900
188. Men inside and on top of wooden stave pipe during installation, January 26, 1900

Dam, headworks and intake area under construction, November 14, 1899
189. Dam, headworks and intake area under construction, November 14, 1899
Confluence of Cedar and Black Rivers, showing dam which will divert Cedar River toward Lake Washington,
190. Confluence of Cedar and Black Rivers, showing dam which will divert Cedar River toward Lake Washington, ca. 1899
Panorama of Masonry Dam under construction, March 17, 1914
191. Panorama of Masonry Dam under construction, March 17, 1914
Cofferdam construction at the Lake Tapps outlet, April 4, 1911
192. Cofferdam construction at the Lake Tapps outlet, April 4, 1911

Cedar River as viewed from Clifford's Bridge near Landsburg headworks site, ca. 1899
193. Cedar River as viewed from Clifford's Bridge near Landsburg headworks site, ca. 1899
Men with shovels digging a trench across the Black River for the pipeline, October 13, 1899
194. Men with shovels digging a trench across the Black River for the pipeline, October 13, 1899
Powerhouse interior showing generating unit no. 1 in operation and unit no. 2 being built, April 19,
195. Powerhouse interior showing generating unit no. 1 in operation and unit no. 2 being built, April 19, 1904
Workers with shovels preparing the slopes of the high service reservoir in City Park for concrete pouring,
196. Workers with shovels preparing the slopes of the high service reservoir in City Park for concrete pouring, January 19, 1900

Men using pulleys to lay pipe in trench beneath Black River, ca. 1899
197. Men using pulleys to lay pipe in trench beneath Black River, ca. 1899
Intake and diversion dam with partially completed radial gate, April 18, 1904
198. Intake and diversion dam with partially completed radial gate, April 18, 1904
Steel pipe being installed in trench in the riverbed of the Black River, ca. 1899
199. Steel pipe being installed in trench in the riverbed of the Black River, ca. 1899
Intake Diversion Dam construction across the Cedar River at Landsburg, November 14, 1899
200. Intake Diversion Dam construction across the Cedar River at Landsburg, November 14, 1899
select all : clear all : add to favorites
results 181-200 of 98724 item(s)  page 10 of 4937 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next

© University of Washington. All rights reserved.
The Community Museum is a project of community organizations and Tribes across the Olympic Peninsula and the University of Washington.
Support for the project comes from the Institute of Museum and Library Services and Preston, Gates and Ellis, LLP.