Search results for o^ > Unknown   
Refine your search

Try Search all Collections


results 121-140 of 507 item(s)  page 7 of 26 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
Powerhouse site and incline railway near Dieringer, May 16, 1910
121. Powerhouse site and incline railway near Dieringer, May 16, 1910
Flume interior showing water flow, July 21, 1911
122. Flume interior showing water flow, July 21, 1911
Intake at the diversion dam near Buckley, July 11, 1911
123. Intake at the diversion dam near Buckley, July 11, 1911
Digging the canal near camp no. 5, February 8, 1911
124. Digging the canal near camp no. 5, February 8, 1911

Construction of the covered flume from the northwest corner of Lake Tapps to the tunnels and penstocks,
125. Construction of the covered flume from the northwest corner of Lake Tapps to the tunnels and penstocks, June 23, 1911
Switches on the roof of the powerhouse, November 2, 1911
126. Switches on the roof of the powerhouse, November 2, 1911
Installing the penstocks in the tunnels, July 20, 1911
127. Installing the penstocks in the tunnels, July 20, 1911
Cut for flume between camps 6 and 7, February 22, 1911
128. Cut for flume between camps 6 and 7, February 22, 1911

Nearly completed south addition to powerhouse, August 26, 24
129. Nearly completed south addition to powerhouse, August 26, 24
First generator installed at the powerhouse, July 20, 1911
130. First generator installed at the powerhouse, July 20, 1911
Main transformers in the powerhouse, November 2, 1911
131. Main transformers in the powerhouse, November 2, 1911
Constructing a circular penstock forebay at the western end of the main tunnel, June 15, 1911
132. Constructing a circular penstock forebay at the western end of the main tunnel, June 15, 1911

Two men with an donkey engine loaded onto railway car at camp no. 8, July 26, 1910
133. Two men with an donkey engine loaded onto railway car at camp no. 8, July 26, 1910
Standpipes for penstocks, at top of hill above powerhouse, February 19, 1912
134. Standpipes for penstocks, at top of hill above powerhouse, February 19, 1912
Boulder spillway construction near the headworks and diversion dam, June 6, 1911
135. Boulder spillway construction near the headworks and diversion dam, June 6, 1911
Construction of outlet canal from Lake Tapps to powerhouse, July 18, 1910
136. Construction of outlet canal from Lake Tapps to powerhouse, July 18, 1910

Timber lining of flume under construction, May 6, 1911
137. Timber lining of flume under construction, May 6, 1911
Steam shovel excavating powerhouse foundation, February 2, 1911
138. Steam shovel excavating powerhouse foundation, February 2, 1911
Sawmill in operation on Lake Tapps, February 16, 1911
139. Sawmill in operation on Lake Tapps, February 16, 1911
Canal excavation at dam headworks, August 4, 1910
140. Canal excavation at dam headworks, August 4, 1910
select all : clear all : add to favorites
results 121-140 of 507 item(s)  page 7 of 26 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next

© University of Washington. All rights reserved.
The Community Museum is a project of community organizations and Tribes across the Olympic Peninsula and the University of Washington.
Support for the project comes from the Institute of Museum and Library Services and Preston, Gates and Ellis, LLP.