Machinery in basement of White River powerhouse, April 12, 1912
1. Machinery in basement of White River powerhouse, April 12, 1912
Interior of Puget Sound Traction, Light and Power Company cottage near the powerhouse, vicnity of Dieringer,
2. Interior of Puget Sound Traction, Light and Power Company cottage near the powerhouse, vicnity of Dieringer, April 12, 1912
Two men taking a reading at a gauging station, June 4, 1903
3. Two men taking a reading at a gauging station, June 4, 1903
Pack train being loaded for trip to headworks site, June 5, 1903
4. Pack train being loaded for trip to headworks site, June 5, 1903

Wood stave pipe and forebay construction, Electron Reservoir, November 17, 1903
5. Wood stave pipe and forebay construction, Electron Reservoir, November 17, 1903
Workers with small railcar hoppers for moving rocks and debris, with cofferdam discharge pipe structure
6. Workers with small railcar hoppers for moving rocks and debris, with cofferdam discharge pipe structure to left, Masonry Dam, April 16, 1912
Gatekeeper's cottage at the diversion dam, April 12, 1912
7. Gatekeeper's cottage at the diversion dam, April 12, 1912
Transmission line tower near camp no. 1 and incline railway near Dieringer, November 2, 1911
8. Transmission line tower near camp no. 1 and incline railway near Dieringer, November 2, 1911

Electron Diversion Dam excavation at the Puyallup River, November 15, 1903
9. Electron Diversion Dam excavation at the Puyallup River, November 15, 1903
Looking west along the tailrace from the powerhouse site toward the Stuck River showing main construction
10. Looking west along the tailrace from the powerhouse site toward the Stuck River showing main construction camp on right, September 22, 1911
Puget Sound Traction, Light and Power Company cottages near the powerhouse, vicnity of Dieringer, April
11. Puget Sound Traction, Light and Power Company cottages near the powerhouse, vicnity of Dieringer, April 12, 1912
Gravel train fitted with snow plow at construction site, Masonry Dam, January 13, 1913
12. Gravel train fitted with snow plow at construction site, Masonry Dam, January 13, 1913

Intake gates at the diversion dam headworks and gatekeeper's house, April 12, 1912
13. Intake gates at the diversion dam headworks and gatekeeper's house, April 12, 1912
Flume line trestle construction, June 9, 1903
14. Flume line trestle construction, June 9, 1903
Two men standing in pipe attached to large valves at Masonry Dam, November 25, 1914
15. Two men standing in pipe attached to large valves at Masonry Dam, November 25, 1914
Diversion dam with intake gates open, April 12, 1912
16. Diversion dam with intake gates open, April 12, 1912

Panoramic view of Lake Tapps, November 21, 1911
17. Panoramic view of Lake Tapps, November 21, 1911
Building embankment trestle for construction of Printz Basin, November 1, 1910
18. Building embankment trestle for construction of Printz Basin, November 1, 1910
Man posed next to turbine water wheel in powerhouse, with pressure regulators to the right, n.d.
19. Man posed next to turbine water wheel in powerhouse, with pressure regulators to the right, n.d.
Penstock installation on hill toward powerhouse, September 15, 1911
20. Penstock installation on hill toward powerhouse, September 15, 1911
select all : clear all : add to favorites
results 1-20 of 5308 item(s)  page 1 of 266 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next

© University of Washington. All rights reserved.
The Community Museum is a project of community organizations and Tribes across the Olympic Peninsula and the University of Washington.
Support for the project comes from the Institute of Museum and Library Services and Preston, Gates and Ellis, LLP.