University of Washington Libraries
Skip to content  Home : Favorites : SC Ordering and Use : Help : Blog   
Digital Collections Special Collections : All Collections : Topics : Search All Collections  
  Share
select all : clear all : add to favorites  page 1 of 2 : ( <<  1  2  >> ) :: previous : next
 
Search results: 24 item(s) for: 4     
Bank checks made out to the Washington Toll Bridge Authority covering the insured loss on the Tacoma
1. Bank checks made out to the Washington Toll Bridge Authority covering the insured loss on the Tacoma Narrows Bridge, April 1941
Broken wire on the Tacoma Narrows Bridge, November 16, 1940
2. Broken wire on the Tacoma Narrows Bridge, November 16, 1940
Broken wires on the Tacoma Narrows Bridge, November 16, 1940
3. Broken wires on the Tacoma Narrows Bridge, November 16, 1940
Cable and broken concrete resulting from the collapse of the Tacoma Narrows Bridge, November 1940
4. Cable and broken concrete resulting from the collapse of the Tacoma Narrows Bridge, November 1940

Cable salvaged from the Tacoma Narrows Bridge being loaded into a truck, 1941
5. Cable salvaged from the Tacoma Narrows Bridge being loaded into a truck, 1941
Cable salvaged from the Tacoma Narrows Bridge being wound on reels, ca. 1942
6. Cable salvaged from the Tacoma Narrows Bridge being wound on reels, ca. 1942
Cable salvaged from the Tacoma Narrows Bridge, ca. 1942
7. Cable salvaged from the Tacoma Narrows Bridge, ca. 1942
Cables and roadbed of the collapsed Tacoma Narrows Bridge with men walking on midspan, November 16, 1940
8. Cables and roadbed of the collapsed Tacoma Narrows Bridge with men walking on midspan, November 16, 1940

Girders being removed from the collapsed Tacoma Narrows Bridge during salvage operations, January 1941
9. Girders being removed from the collapsed Tacoma Narrows Bridge during salvage operations, January 1941
Man looking through broken wires of the Tacoma Narrows Bridge, November 16, 1940
10. Man looking through broken wires of the Tacoma Narrows Bridge, November 16, 1940
Narrows Span Total Loss, Board Claims, March 11, 1941
11. Narrows Span Total Loss, Board Claims, March 11, 1941
Salvage operation on the tower of the Tacoma Narrows Bridge, 1943
12. Salvage operation on the tower of the Tacoma Narrows Bridge, 1943

Salvage operation on the tower of the Tacoma Narrows Bridge, ca. 1943
13. Salvage operation on the tower of the Tacoma Narrows Bridge, ca. 1943
Salvaging the cables from the Tacoma Narrows Bridge, January 1943
14. Salvaging the cables from the Tacoma Narrows Bridge, January 1943
Span Joins Scrap Pile, October 10, 1942
15. Span Joins Scrap Pile, October 10, 1942
Span Model Withstood Gale, Says Bewildered Designer, November 14, 1940
16. Span Model Withstood Gale, Says Bewildered Designer, November 14, 1940

Tacoma Narrows Bridge after the collapse showing only the towers and cable, ca. 1941
17. Tacoma Narrows Bridge after the collapse showing only the towers and cable, ca. 1941
Tacoma Narrows Bridge salvage operations after the roadway was removed, ca. 1942
18. Tacoma Narrows Bridge salvage operations after the roadway was removed, ca. 1942
Toll schedule for the Tacoma Narrows ferry, effective March 1, 1941
19. Toll schedule for the Tacoma Narrows ferry, effective March 1, 1941
Underside of the roadway of the Tacoma Narrows Bridge during salvage operations, December 1940
20. Underside of the roadway of the Tacoma Narrows Bridge during salvage operations, December 1940
select all : clear all : add to favorites  page 1 of 2 : ( <<  1  2  >> ) :: previous : next
Contact Us | Change display settings | About | Make a Gift | UW Libraries Home ^ to top ^